| Septic Release Inspection |
|
Health Dept |
12/7/2023 |
| Passed: Plumbing/Gas - 2nd Rough-In |
Spa |
Anthony Aslan |
2/22/2024 |
| Passed: Swimming Pool - Pool Steel and Ground |
|
Anthony Aslan |
2/22/2024 |
| Passed: Engineering - Setbacks |
|
Anthony Aslan |
2/22/2024 |
| Passed: Swimming Pool - Pool Deck/Piping Pressure |
|
Anthony Aslan |
4/23/2024 |
| Passed: Swimming Pool - Pool Footer |
|
Anthony Aslan |
5/3/2024 |
| Passed: Engineering - Setbacks |
|
Anthony Aslan |
5/3/2024 |
| Passed: Electrical - Pool/Deck Bonding |
|
Anthony Aslan |
5/17/2024 |
| Passed: Swimming Pool - Pool Safety and Final |
|
Anthony Aslan |
10/23/2024 |