- Finished floor requirement
-
- Fema map number
- 12023C0270C
- Type Roofing Job
- Overlay with Metal
- Further Job Details (Explain if decking is being replaced and or Repairs are being done.)
- Replace wood as needed
- Type of structure
- House
- Commercial or Residential
- Residential
- Roof Area (for this job) Sq Ft
- 51
- No. of Stories
- 1
- Roof Pitch
- 2:12 to 4:12
- Type of New Roofing Product
- Metal
- Florida Product Approval Number
- FL17992.1R2
- Product Manufacturer
- Capital
- Product Description
- 26 GA Rib
- Building Code Edition
- 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
- Sealed roof decking options: (Must select an option.)
- Other (explain)
- Sealed roof decking explanation for other option.
- Metal Roof-Over no underlayment needed
- Ventilation:
- Ridge Vent
- Flashing:
- Use Existing
- Drip Edge:
- Replace All
- Valley Treatment:
- New Metal
- Second Roof Pitch (if applicable)
- 4:12 or Greater
- Any cable and/or race-way wiring located on or within the roof assembly?
- No