Permit Details

Permit Search

Permit

New Residential Construction

231 SW PLYMOUTH AVE
FORT WHITE, FL 32038

Permit #
000049014
Application #
63348
Status Completed
  1. Submitted Dec 7, 2023
  2. Issued Jan 12, 2024
  3. Expires Jan 19, 2025
  4. Completed Jul 23, 2024

Property

Parcel #
14307-007
Owner
Smith Elizabeth, Smith Ian M
Acres
0.58
Subdivision
—
Zoning
—
Flood zone
X
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0490C
This is the construction of a
Single Family Dwelling
Setbacks Front
25'
Setback Side 1
10'
Setback Side 2
10'
Setbacks Rear
15'
Stories
1
Heated Area (Sqft)
1893
Total Area (Sqft)
2050
Building Height
20
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
23-0828
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Service Amps
0

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - On Hold-Incomplete
  4. Point Review - Printed-Online Application
  5. Point Review - Reviewed
  6. Plan Review - Documents Required
  7. Plan Review - On Hold-Incomplete
  8. Plan Review - On Hold-Incomplete
  9. Plan Review - Documents Required
  10. Plan Review - Building Approved
  11. Plan Review - Electrical Approved
  12. Plan Review - Mechanical Approved
  13. Plan Review - Plumbing Approved
  14. Plan Review - Fuel/Gas Approved
  15. Plan Review - Reviewed
  16. Zoning Review - Reviewed
  17. Final Review - Documents Required
  18. Final Review - Documents Required
  19. Final Review - Reviewed
  20. Final Review - Payment Needed
  21. Permit Issued

Contractors

  • John Crawford

    John F Crawford Homes

    License
    CBC1264448
    Title
    Cert. General
    Role
    Contractor

    County License & State License Expired.

  • Ryan C Beville

    Rbi Electrical Contracting Llc

    License
    EC13004236
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Jason Shadd

    Shadd Heating And Air

    License
    CAC1817241
    Title
    Cert. Mechanical
    Role
    Subcontractor

    County License & State License & Liability Insurance Expired.

  • James Butler Jr

    Butler Plumbing Of Gainesville Inc

    License
    CFC057960
    Title
    Plumbing Contractor
    Role
    Subcontractor

Inspections

  1. Jan 30, 2024

    Passed: Building - Framing

    Window And Door Attachment

    Inspected by Anthony Aslan

  2. Feb 2, 2024

    Failed: Plumbing/Gas - 1st Underground Rough–In

    Waste Lines Test Not Full, Plumbing Covered And Slab Prepared Prior To Inspection. Need To Fill Test And Plumber Needs To Provide Letterhead With Signature That Plumbing Correct To Code. Also Need Compaction Test On Fill Dirt Prior To Slab.

    Inspected by Troy Crews

  3. Feb 5, 2024

    Failed: Building - Slab

    Need Compaction Test And Plumbing Inspection Satisfied Prior To Pour.

    Inspected by Troy Crews

  4. Feb 6, 2024

    Passed: Building - Slab

    Inspected by Anthony Aslan

  5. Feb 7, 2024

    Passed: Electrical - Temporary Service

    Inspected by Anthony Aslan

  6. Feb 7, 2024

    Release to power company

    Inspected by Anthony Aslan

  7. Feb 14, 2024

    Passed: Building - Roof Decking

    Inspected by Anthony Aslan

  8. Feb 14, 2024

    Passed: Building - Wall Sheathing

    Inspected by Anthony Aslan

  9. Feb 28, 2024

    Passed: Building - Framing

    Inspected by Anthony Aslan

  10. Feb 28, 2024

    Passed: Plumbing/Gas - Tub Set/Shower Pan

    Showers Have Water In Pan

    Inspected by Anthony Aslan

  11. Feb 28, 2024

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Anthony Aslan

  12. Feb 28, 2024

    Passed: Mechanical - Rough In

    Inspected by Anthony Aslan

  13. Feb 28, 2024

    Passed: Electrical - 2nd Rough-In

    Inspected by Anthony Aslan

  14. Mar 6, 2024

    Passed: Building - Insulation

    Spray Foam Attic

    Inspected by Anthony Aslan

  15. Apr 24, 2024

    Passed: Electrical - Permanent Power

    Need Septic Release

    Inspected by Anthony Aslan

  16. May 14, 2024

    Release to power company

    Rec'd Septic

    Inspected by Anthony Aslan

  17. May 14, 2024

    Septic Release Inspection

    Inspected by Health Dept

  18. May 22, 2024

    Release to power company

    Releasing Power

    Inspected by Neonta Anderson

  19. Jul 23, 2024

    Passed: Building - Final

    Dryer Vent Missing Louvers

    Inspected by Anthony Aslan

Documents