New Residential Construction

613 SE ROSEWOOD CIR
LAKE CITY, FL 32025

Permit #
000048739
Application #
62888
Status Completed
  1. Submitted Oct 5, 2023
  2. Issued Feb 13, 2024
  3. Expires Mar 10, 2025
  4. Completed Sep 19, 2024

Property

Parcel #
07592-603
Owner
Harrell Sharon Ward,
Acres
0.70
Subdivision
—
Zoning
RMF-1
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0311D
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
25'
Setback Side 1
10'
Setback Side 2
10'
Setbacks Rear
15'
Stories
1
Heated Area (Sqft)
1270
Total Area (Sqft)
1648
Building Height
17
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
x-city
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. City of Lake City Utilities Notified
  4. Point Review - Printed-Online Application
  5. Plan Review - Documents Required
  6. Plan Review - Documents Required
  7. Plan Review - Building Approved
  8. Plan Review - Electrical Approved
  9. Plan Review - Mechanical Approved
  10. Plan Review - Plumbing Approved
  11. Plan Review - Fuel/Gas Approved
  12. Plan Review - Reviewed
  13. Zoning Review - Reviewed
  14. Final Review - Reviewed
  15. Final Review - Payment Needed
  16. Final Review - Payment Needed
  17. Permit Issued
  18. Permit Reissued

Contractors

  • Carrie Cason

    Stanley Crawford Construction Inc

    License
    CBC1254767
    Title
    Cert. Building
    Role
    Contractor

    County License & State License & Liability Insurance & Workers Comp Expired.

  • Ralph W Laverdure

    Rwl Roofing Llc

    License
    CCC1328590
    Title
    Roofing Contractor
    Role
    Subcontractor

    County License & State License & Liability Insurance & Workers Comp Expired.

  • Donald Davis

    High Springs Electric Inc

    License
    EC0002306
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Stephen M Brisbois

    Epic Ac Service (dba) Central Home Heating & Air Llc

    License
    CAC1819412
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

Inspections

  1. Dec 19, 2023

    Passed: Building - Footer

    Inspected by Anthony Aslan

  2. Dec 19, 2023

    Passed: Engineering - Setbacks

    Tight Lot May Need Surveyor Verification

    Inspected by Anthony Aslan

  3. Jan 23, 2024

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Dvw Under Slab

    Inspected by Gary Pitzer

  4. Jan 25, 2024

    Passed: Building - Slab

    Inspected by Anthony Aslan

  5. Feb 15, 2024

    Passed: Building - Ext Strapping/Wall Sheathing

    Missing Nails Back Wall Under Window Marked With Red Marker

    Inspected by Anthony Aslan

  6. Feb 15, 2024

    Passed: Building - Roof Decking

    Inspected by Anthony Aslan

  7. Feb 15, 2024

    Cancelled: Building - Strapping

    Inspected by Anthony Aslan

  8. Feb 15, 2024

    Cancelled: Building - Wall Sheathing

    Inspected by Anthony Aslan

  9. Mar 18, 2024

    Passed: Building - Framing

    Some Windows And Doors Not Installed

    Inspected by Anthony Aslan

  10. Mar 18, 2024

    Passed: Electrical - 2nd Rough-In

    Inspected by Anthony Aslan

  11. Mar 18, 2024

    Passed: Mechanical - Rough In

    Inspected by Anthony Aslan

  12. Mar 18, 2024

    Passed: Plumbing/Gas - 2nd Rough-In

    No Water In Tub

    Inspected by Anthony Aslan

  13. Apr 3, 2024

    Passed: Building - Insulation

    Walls Only, Pieces Fallen Out Reinstall

    Inspected by Anthony Aslan

  14. Jul 2, 2024

    Passed: Electrical - Permanent Power

    Need c/o's Paid garage Door Installed no Locks On House garage

    Inspected by Anthony Aslan

  15. Jul 24, 2024

    Release to power company

    Fire/waste Paid

    Inspected by Emaleigh Williams

  16. Sep 11, 2024

    Passed: Building - Final

    Cannot Closed Permit Or Release Certificate Of Occupancy Due To Missing Required Documents.

    Inspected by Anthony Aslan

  17. Sep 19, 2024

    Certificate-Release Certificate

    Rec'd Missing Doc/termite

    Inspected by Anthony Aslan

Documents