Permit Details

Permit Search

Permit

New Residential Construction

114 NW WHITTON CT
LAKE CITY, FL 32055

Permit #
000048708
Application #
62759
Status Completed
  1. Submitted Oct 13, 2023
  2. Issued Nov 20, 2023
  3. Expires Mar 30, 2025
  4. Completed Oct 4, 2024

Property

Parcel #
02202-118
Owner
Karlton Matthew B, Karlton Lyndi M
Acres
15.54
Subdivision
High Pointe
Zoning
PRRD
Flood zone
X
District
3

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0280D
In floodway
N
This is the construction of a
Accessory Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
799
Total Area (Sqft)
1014
Building Height
19
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
accessory dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
23-0668
If Other, explain the use of the structure.
mother-in-law suite next to the main house
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Printed-Online Application
  4. Point Review - Reviewed
  5. Plan Review - Building Approved
  6. Plan Review - Electrical Approved
  7. Plan Review - Mechanical Approved
  8. Plan Review - Plumbing Approved
  9. Plan Review - Reviewed
  10. Zoning Review - Reviewed
  11. Final Review - Reviewed
  12. Final Review - Payment Needed
  13. Permit Issued

Contractors

  • Bryan Zecher

    Bryan Zecher Homes Inc

    License
    CBC1257343
    Title
    Building Contractor
    Role
    Contractor
  • Donald R Hollingsworth

    Holly Electric Inc

    License
    EC13005429
    Title
    Electrical
    Role
    Subcontractor
  • Anthony R Franks

    Lane Heating & Air Llc

    License
    CAC1818631
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

    County License & State License Expired.

  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Robert Ogles

    Ogles Roofing & Construction Llc

    License
    CCC1328699
    Title
    Cert Roofing
    Role
    Subcontractor

    County License & State License Expired.

Inspections

  1. Nov 27, 2023

    Passed: Building - Footer

    Inspected by Matt Forsyth

  2. Nov 27, 2023

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  3. Jan 5, 2024

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected With Other Permit.

    Inspected by Matt Forsyth

  4. Jan 22, 2024

    Passed: Building - Slab

    Mother In Law

    Inspected by Matt Forsyth

  5. Mar 27, 2024

    Passed: Building - Roof Decking

    Mother-in-law

    Inspected by Anthony Aslan

  6. Mar 27, 2024

    Passed: Building - Wall Sheathing

    Mother-in-law

    Inspected by Anthony Aslan

  7. May 10, 2024

    Passed: Building - Framing

    Inspected by Matt Forsyth

  8. May 10, 2024

    Passed: Electrical - 2nd Rough-In

    Inspected by Matt Forsyth

  9. May 10, 2024

    Passed: Mechanical - Rough In

    Inspected by Matt Forsyth

  10. May 10, 2024

    Passed: Plumbing/Gas - 2nd Rough-In

    Tub Water Tested

    Inspected by Matt Forsyth

  11. May 21, 2024

    Passed: Building - Lath/Stucco

    All Fasteners Have Been Inspected

    Inspected by Matt Forsyth

  12. May 24, 2024

    Passed: Building - Insulation

    Inspected by Matt Forsyth

  13. Jul 19, 2024

    Septic Release Inspection

    Inspected by Health Dept

  14. Jul 31, 2024

    Passed: Electrical - Permanent Power

    Inspected by Matt Forsyth

  15. Aug 1, 2024

    Release to power company

    Inspected by Matt Forsyth

  16. Oct 1, 2024

    Passed: Building - Final

    Blower Door Test And Final Termite Treatment Needs To Be Sent To The Office

    Inspected by Matt Forsyth

  17. Oct 4, 2024

    Certificate-Release Certificate

    Rec'd Blower Door And Termite

    Inspected by Matt Forsyth

Documents