Permit Details

Permit Search

Permit

Roof Replacement or Repair

217 SW LUCILE CT
LAKE CITY, FL 32024

Permit #
000048538
Application #
63174
Status Completed
  1. Submitted Oct 26, 2023
  2. Issued Oct 30, 2023
  3. Expires Aug 3, 2024
  4. Completed Feb 5, 2024

Property

Parcel #
02911-320
Owner
Parker Dalton W, Parker Amber R
Acres
0.51
Subdivision
May-fair Unit 3
Zoning
RSF-2
Flood zone
A
District
3

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0290D
Type Roofing Job
Replacement - Tear off Existing and Replace
Type of structure
House
Commercial or Residential
Residential
Roof Area (for this job) Sq Ft
41
No. of Stories
1
Roof Pitch
4:12 or Greater
Is the existing roof being removed?
Yes
Type of New Roofing Product
Asphalt Shingles
Florida Product Approval Number
FL18355-R8
Product Manufacturer
TAMKO Asphalt Shingles
Product Description
ASTM D3462 asphalt shingles and hip and ridge shingles
Building Code Edition
2020 Florida Building Code 7th Edition and Florida Statute 553.844
Sealed roof decking options: (Must select an option.)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Ventilation:
Ridge Vent
Flashing:
Use Existing
Drip Edge:
Replace All
Valley Treatment:
New Metal
Any cable and/or race-way wiring located on or within the roof assembly?
No

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Final Review - Payment Needed
  4. Permit Issued

Contractors

  • Tyler M Turner

    Tmt Roofing Llc

    License
    CCC1330410
    Title
    Cert Roofing
    Role
    Contractor

Inspections

  1. Jan 26, 2024

    Rescheduled 1/30/2024:Re-Roof - In Progress

    Inspected by Emaleigh Williams

  2. Jan 30, 2024

    Passed: Re-Roof - In Progress

    Off Ridge Vents

    Inspected by Matt Forsyth

  3. Feb 5, 2024

    Passed: Re-Roof - Final

    Inspected by Matt Forsyth