Permit Details

Permit Search

Permit

New Residential Construction

226 SW CHERRY BLOSSOM WAY
LAKE CITY, FL 32024

Permit #
000048490
Application #
62055
Status Completed
  1. Submitted Jul 28, 2023
  2. Issued Oct 24, 2023
  3. Expires Mar 16, 2025
  4. Completed Sep 17, 2024

Property

Parcel #
03011-125
Owner
Gator Land Development, Llc,
Acres
0.28
Subdivision
Rose Pointe
Zoning
PRD
Flood zone
X
District
3

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Subdivision Plat
Finished floor requirement
104.0'
Requirement needed
By Nailing Inspection
Document needed is
a Surveyor letter giving the Finished Floor Elevation
Document receieved
Yes
Fema map number
12023C0289D
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
25'
Setback Side 1
10'
Setback Side 2
10'
Setbacks Rear
15'
Stories
1
Heated Area (Sqft)
1596
Total Area (Sqft)
2225
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
SINGLE FAMILY DWELLING
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
23-0573
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.

Status & Review History

  1. City of Lake City Notified of Application within Utility Service Areas LC_WATER,.
  2. Point Review - Reviewed
  3. Plan Review - Corrections Needed
  4. Plan Review - Building Approved
  5. Plan Review - Electrical Approved
  6. Plan Review - Mechanical Approved
  7. Plan Review - Plumbing Approved
  8. Plan Review - Fuel/Gas Approved
  9. Plan Review - Reviewed
  10. Zoning Review - Contact the Building Dept
  11. Zoning Review - Contact the Building Dept
  12. Zoning Review - Corrections Needed
  13. Zoning Review - Reviewed
  14. Final Review - Processing
  15. Final Review - Reviewed
  16. Final Review - Payment Needed
  17. Permit Issued

Contractors

  • Marcus Matthews

    Matthews Electric Llc

    License
    EC13005459
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Robert Jarvis

    Jarvis Heat And Air Llc

    License
    CAC1816766
    Title
    Class "b" A/c
    Role
    Subcontractor

    County License & State License Expired.

  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Joseph C Peurrung

    Benchmark Builders Llc

    License
    CBC1259347
    Title
    Cert. Building
    Role
    Contractor

Inspections

  1. Nov 13, 2023

    Passed: Building - Footer

    Inspected by Matt Forsyth

  2. Nov 13, 2023

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  3. Nov 13, 2023

    Passed: Electrical - Temporary Service

    Inspected by Matt Forsyth

  4. Nov 13, 2023

    Release to power company

    Inspected by Matt Forsyth

  5. Nov 29, 2023

    Passed: Electrical - 1st Underground Rough–In

    Inspected by Matt Forsyth

  6. Nov 29, 2023

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Matt Forsyth

  7. Dec 6, 2023

    Passed: Building - Slab

    Hold Up Perimeter Bar Minimum Three Quarter Inch Off Cement Block

    Inspected by Matt Forsyth

  8. Dec 19, 2023

    Cancelled: Mechanical - Rough In

    Inspected by Melissa Garber

  9. Jan 29, 2024

    Passed: Building - Ext Strapping/Wall Sheathing

    Inspected by Matt Forsyth

  10. Jan 29, 2024

    Passed: Building - Roof Decking

    Inspected by Matt Forsyth

  11. Feb 20, 2024

    Failed: Building - Framing

    Check Soul Plate Anchor Bolts Each Side Engineering Needs To Be Two By Material Instead Of 1 By Need Diagonal Bracing On Gable End

    Inspected by Matt Forsyth

  12. Feb 28, 2024

    Passed: Building - Framing

    Items Have Been Addressed

    Inspected by Matt Forsyth

  13. Mar 21, 2024

    Passed: Electrical - 2nd Rough-In

    We Need A Shield Plate At Top Of Wall Service Entrance Will Check On Insulation Inspection

    Inspected by Matt Forsyth

  14. Mar 21, 2024

    Passed: Mechanical - Rough In

    We Need A Shield Plate Top Of Wall Dryer Duct Will Check On Inspection For Insulation

    Inspected by Matt Forsyth

  15. Mar 21, 2024

    Passed: Plumbing/Gas - 2nd Rough-In

    Tub Water Tested

    Inspected by Matt Forsyth

  16. Mar 27, 2024

    Passed: Building - Insulation

    Inspected by Matt Forsyth

  17. Jul 17, 2024

    Passed: Electrical - Permanent Power

    Need Septic Release And Picture Of Dead Cover On Electrical Panel

    Inspected by Matt Forsyth

  18. Aug 15, 2024

    Passed: Electrical - Permanent Power

    Need Septic

    Inspected by Matt Forsyth

  19. Aug 22, 2024

    Release to power company

    Rec'd Septic

    Inspected by Emaleigh Williams

  20. Aug 22, 2024

    Septic Release Inspection

    Inspected by Health Dept

  21. Sep 17, 2024

    Certificate-Release Certificate

    Inspected by Matt Forsyth

  22. Sep 17, 2024

    Passed: Building - Final

    Cannot Closed Permit Or Release Certificate Of Occupancy Due To Missing Required Documents.

    Inspected by Matt Forsyth

Documents