Permit Details

Permit Search

Permit

Mobile Home

242 NW MACKMARY PL
LAKE CITY, FL 32055

Permit #
000048392
Application #
62636
Status Completed
  1. Submitted Sep 15, 2023
  2. Issued Oct 11, 2023
  3. Expires Sep 18, 2024
  4. Completed Mar 22, 2024

Property

Parcel #
02031-004
Owner
Overstreet Amy M, Hall Shannon R
Acres
16.30
Subdivision
—
Zoning
A-3
Flood zone
X
District
3

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0260C
In floodway
N
Mobile Home is a:
Single Wide
Year Built
2024
Width (Ft.In)
16
Length (Ft.In)
76
Driveway access to home:
Existing Drive
Installation Decal #
103384
Special temporary use permit number:
2309-45
Septic #
23-0704
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Dev Permit #
F023-
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
Yes
Serial #
whc031084gaabac
Wind Zone?
2
Residential or Commercial Use?
Residential

Status & Review History

  1. Point Review - Reviewed
  2. Plan Review - Reviewed
  3. Zoning Review - Reviewed
  4. Final Review - Documents Required
  5. Final Review - Reviewed
  6. Final Review - Payment Needed
  7. Permit Issued

Contractors

  • Dale Houston

    Dale Houstons Mobile Home Set Up And Service

    License
    IH1133271
    Title
    Mh Installer (ih)
    Role
    Contractor
  • Glenn Whittington

    Whittington Electric Inc

    License
    EC13002957
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Steven M Mollman

    Mollman Air Conditioning And Refrigeration Llc

    License
    CAC1819696
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

Inspections

  1. Mar 22, 2024

    Release to power company

    Inspected by Melissa Garber

  2. Mar 22, 2024

    Certificate-Release Certificate

    Inspected by Matt Forsyth

  3. Mar 22, 2024

    Passed: Mobile Home - Mobile Home Set-Up Final

    Need Septic Release To Complete The Permit And Release Power

    Inspected by Matt Forsyth

  4. Mar 22, 2024

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  5. Mar 22, 2024

    Septic Release Inspection

    Inspected by Health Dept