Permit Details

Permit Search

Permit

Roof Replacement or Repair

315 SW MAGNOLIA LN
FORT WHITE, FL 32038

Permit #
000048322
Application #
62806
Status Completed
  1. Submitted Oct 3, 2023
  2. Issued Oct 3, 2023
  3. Expires Apr 23, 2024
  4. Completed Oct 26, 2023

Property

Parcel #
10058-618
Owner
Bird Terry A, Bird Patricia J
Acres
2.12
Subdivision
Santa Fe River Plantations Replat Of Lots 38,45,46
Zoning
A-3
Flood zone
X
District
2

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0532C
Type Roofing Job
Replacement - Tear off Existing and Replace
Further Job Details (Explain if decking is being replaced and or Repairs are being done.)
Remove existing shingles and replace with new 26G metal on 1x4 purlins.
Type of structure
House
Commercial or Residential
Residential
Roof Area (for this job) Sq Ft
2753
No. of Stories
1
Roof Pitch
4:12 or Greater
Is the existing roof being removed?
Yes
Type of New Roofing Product
Metal
Florida Product Approval Number
17992.1 R3
Product Manufacturer
CAPITAL METAL SUPPLY, INC
Product Description
Capital Rib Roof Panel, Min. 29 Ga. Steel, 36” Wide, through fastened roof panel over 1x4 wood purlins over minimum 7/16” OSB decking. Non-structural Application.
Building Code Edition
2020 Florida Building Code 7th Edition and Florida Statute 553.844
Sealed roof decking options: (Must select an option.)
a self-adhering polymer-modified bitumen underlayment complying with ASTM D1970 applied over the entire roof.
Ventilation:
Ridge Vent
Flashing:
Replace All
Drip Edge:
Replace All
Valley Treatment:
New Metal
Any cable and/or race-way wiring located on or within the roof assembly?
No

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Final Review - Payment Needed
  4. Permit Issued

Contractors

  • Donald Burnsed

    True Force Roofing

    License
    CCC1333814
    Title
    Cert. Roofing
    Role
    Contractor

    County License & State License Expired.

Inspections

  1. Oct 6, 2023

    Rescheduled 10/10/2023:Re-Roof - In Progress

    Inspected by Melissa Garber

  2. Oct 10, 2023

    Failed: Re-Roof - In Progress

    No Work Started

    Inspected by Matt Forsyth

  3. Oct 19, 2023

    Passed: Re-Roof - In Progress

    Inspected by Anthony Aslan

  4. Oct 26, 2023

    Passed: Re-Roof - Final

    Inspected by Anthony Aslan