Permit Details

Permit Search

Permit

New Residential Construction

1023 SW CUMORAH HILL ST
FORT WHITE, FL 32038

Permit #
000048197
Application #
61973
Status Completed
  1. Submitted Jul 21, 2023
  2. Issued Sep 19, 2023
  3. Expires Jan 27, 2025
  4. Completed Mar 6, 2025

Property

Parcel #
09698-002
Owner
Gabriel James, Gabriel Tara Jo
Acres
19.46
Subdivision
—
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0485C
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
30
Setback Side 1
25
Setback Side 2
25
Setbacks Rear
25
Stories
1
Heated Area (Sqft)
2923
Total Area (Sqft)
3891
Building Height
1.5
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
23-0547
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.

Status & Review History

  1. Point Review - Printed-Online Application
  2. Plan Review - Corrections Needed
  3. Plan Review - Building Approved
  4. Plan Review - Electrical Approved
  5. Plan Review - Mechanical Approved
  6. Plan Review - Plumbing Approved
  7. Plan Review - Fuel/Gas Approved
  8. Plan Review - Reviewed
  9. Zoning Review - Reviewed
  10. Final Review - Corrections Needed
  11. Final Review - Corrections Needed
  12. Final Review - Corrections Needed
  13. Final Review - Reviewed
  14. Final Review - Payment Needed
  15. Permit Issued
  16. Final Review - Payment Needed
  17. Plan Review - Reviewed
  18. Final Review - Payment Needed
  19. Final Review - Payment Needed
  20. Final Review - Contact the Building Dept
  21. Final Review - Contact the Building Dept
  22. Final Review - Contact the Building Dept

Contractors

  • Mark Bauer

    Gibraltar Contracting Llc

    License
    CBC1259633
    Title
    Cert Building
    Role
    Contractor

    County License & State License Expired.

  • Donald Davis

    High Springs Electric Inc

    License
    EC0002306
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Clinton G Wilson

    Wilson Heat & Air Inc

    License
    CAC057886
    Title
    Class B A/c
    Role
    Subcontractor
  • James Butler Jr

    Butler Plumbing Of Gainesville Inc

    License
    CFC057960
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Lewis G Walker

    Lewis Walker Roofing Inc

    License
    CCC1333551
    Title
    Cert. Roofing
    Role
    Subcontractor

Inspections

  1. Sep 25, 2023

    Failed: Building - Footer

    Please Have Engineer Verify That This Building Will Be Finish Floor 1 Ft Above Road. Unable To Determine This At Site

    Inspected by Gary Pitzer

  2. Sep 25, 2023

    Failed: Engineering - Setbacks

    I Did Not See Any Plot Plan Location On Site

    Inspected by Gary Pitzer

  3. Oct 18, 2023

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Gary Pitzer

  4. Oct 18, 2023

    Passed: Engineering - Setbacks

    Inspected by Gary Pitzer

  5. Oct 18, 2023

    Passed: Building - Footer

    Inspected by Gary Pitzer

  6. Oct 18, 2023

    Passed: Engineering - Setbacks

    Inspected by Gary Pitzer

  7. Oct 20, 2023

    Passed: Building - Slab

    Rebar Wired, Wire, Plastic And Taped. Please Provide Termite For Underslab

    Inspected by Gary Pitzer

  8. Dec 18, 2023

    Passed: Building - Roof Decking

    Inspected by Gary Pitzer

  9. Dec 18, 2023

    Passed: Building - Wall Sheathing

    Inspected by Gary Pitzer

  10. Jan 23, 2024

    Passed: Electrical - Temporary Service

    Temp Pole

    Inspected by Gary Pitzer

  11. Jan 23, 2024

    Release to power company

    Inspected by Gary Pitzer

  12. Feb 1, 2024

    Passed: Building - Framing

    Partial For Porches

    Inspected by Gary Pitzer

  13. Mar 15, 2024

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Gary Pitzer

  14. Mar 15, 2024

    Passed: Building - Framing

    Inspected by Gary Pitzer

  15. Mar 15, 2024

    Passed: Electrical - 2nd Rough-In

    Inspected by Gary Pitzer

  16. Mar 15, 2024

    Passed: Mechanical - Rough In

    Inspected by Gary Pitzer

  17. Apr 1, 2024

    Passed: Building - Insulation

    Inspected by Gary Pitzer

  18. May 22, 2024

    Passed: Electrical - Permanent Power

    400 Amp Service

    Inspected by Gary Pitzer

  19. May 22, 2024

    Release to power company

    Inspected by Gary Pitzer

  20. Jun 18, 2024

    Septic Release Inspection

    Inspected by Health Dept

  21. Jul 31, 2024

    Passed: Building - Final

    Need Engineer Letter For Finish Floor Elevation

    Inspected by Gary Pitzer

Documents