Permit Details

Permit Search

Permit

Additions

699 SW MANDIBA DR
LAKE CITY, FL 32024

Permit #
000048173
Application #
58567
Status Completed
  1. Submitted Jan 13, 2023
  2. Issued Sep 18, 2023
  3. Expires Aug 5, 2024
  4. Completed Feb 7, 2024

Property

Parcel #
09280-122
Owner
Coleman Jennifer C, Coleman Christopher B
Acres
3.02
Subdivision
Oaks Of Lake City Phase 1
Zoning
PRRD
Flood zone
X
District
5

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
MATCH EXISTING FINISHED FLOOR ELEVATION
Fema map number
12023C0395C
Description of addition:
bedroom
Select driveway access to property:
Existing Drive
Fire sprinklers?
No
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setback Rear
25'
Stories
1
Heated Area (Sqft)
153
Total Area (Sqft)
153
Total Estimated Cost
25120
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Dev Permit #
F023-
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic#
23-0013
Is this an addition for commercial or residential use?
Residential
Sealed roof decking options. (Must select one.)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Printed-Online Application
  4. Point Review - Reviewed
  5. Plan Review - Documents Required
  6. Plan Review - Documents Required
  7. Plan Review - Building Approved
  8. Plan Review - Electrical Approved
  9. Plan Review - Mechanical Approved
  10. Plan Review - Plumbing Approved
  11. Plan Review - Fuel/Gas Approved
  12. Plan Review - Reviewed
  13. Zoning Review - Reviewed
  14. Final Review - Reviewed
  15. Final Review - Reviewed
  16. Final Review - Payment Needed
  17. Final Review - Payment Needed
  18. Final Review - Payment Needed
  19. Final Review - Contact the Building Dept
  20. Final Review - Contact the Building Dept
  21. Permit Issued

Contractors

  • Bryan Zecher

    Bryan Zecher Construction Inc

    License
    CBC054575
    Title
    Cert.building Contractor
    Role
    Contractor
  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Robert Ogles

    Ogles Roofing & Construction Llc

    License
    CCC1328699
    Title
    Cert Roofing
    Role
    Subcontractor

    County License & State License Expired.

  • Donald R Hollingsworth

    Holly Electric Inc

    License
    EC13005429
    Title
    Electrical
    Role
    Subcontractor
  • Anthony R Franks

    Lane Heating & Air Llc

    License
    CAC1818631
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

    County License & State License Expired.

Inspections

  1. Jan 17, 2023

    Septic Release Inspection

    Inspected by Health Dept

  2. Dec 5, 2023

    Passed: Building - Footer

    Inspected by Gary Pitzer

  3. Dec 5, 2023

    Passed: Engineering - Setbacks

    Inspected by Gary Pitzer

  4. Dec 5, 2023

    Passed: Building - Slab

    Inspected by Gary Pitzer

  5. Jan 4, 2024

    Building-Roof Decking

    East Addtion

    Inspected by Gary Pitzer

  6. Jan 4, 2024

    Building-Framing

    East Addtion

    Inspected by Gary Pitzer

  7. Jan 4, 2024

    Passed: Building - Ext Strapping/Wall Sheathing

    East Addtion

    Inspected by Gary Pitzer

  8. Jan 10, 2024

    Passed: Building - Framing

    Inspected by Gary Pitzer

  9. Jan 10, 2024

    Passed: Electrical - 2nd Rough-In

    Inspected by Gary Pitzer

  10. Jan 10, 2024

    Passed: Mechanical - Rough In

    Inspected by Gary Pitzer

  11. Feb 7, 2024

    Passed: Building - Final

    Inspected by Gary Pitzer