Permit Details

Permit Search

Permit

New Residential Construction

172 NW CREWS GLN
LAKE CITY, FL 32055

Permit #
000048052
Application #
61758
Status Completed
  1. Submitted Jul 3, 2023
  2. Issued Sep 7, 2023
  3. Expires Jul 1, 2024
  4. Completed Jan 3, 2024

Property

Parcel #
01901-014
Owner
Gonzalez Emiraida Jorge,
Acres
2.37
Subdivision
—
Zoning
A-3
Flood zone
X
District
1

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0195D
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
1365
Total Area (Sqft)
1488
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
23-0432
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.

Status & Review History

  1. Point Review - Received-Hard Copy Application
  2. Point Review - Reviewed
  3. Plan Review - Corrections Needed
  4. Plan Review - Building Approved
  5. Plan Review - Electrical Approved
  6. Plan Review - Mechanical Approved
  7. Plan Review - Plumbing Approved
  8. Plan Review - Reviewed
  9. Zoning Review - Reviewed
  10. Final Review - Reviewed
  11. Final Review - Payment Needed
  12. Permit Issued

Contractors

This is an owner-builder project.

Inspections

  1. Sep 14, 2023

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Plumbing Drains, Vents, Cross Over Water To Island, No Gas

    Inspected by Gary Pitzer

  2. Sep 18, 2023

    Electrical -1st Underground Rough–In

    Steel Bonding

    Inspected by Gary Pitzer

  3. Sep 18, 2023

    Passed: Building - Monolithic Slab

    Inspected by Gary Pitzer

  4. Sep 18, 2023

    Passed: Engineering - Setbacks

    Inspected by Gary Pitzer

  5. Oct 2, 2023

    Passed: Building - Vertical Cells/Columns

    Inspected by Gary Pitzer

  6. Oct 2, 2023

    Passed: Building - Masonry Wall Reinforcing

    Inspected by Gary Pitzer

  7. Oct 2, 2023

    Passed: Building - Lintel/Tie Beam

    Inspected by Gary Pitzer

  8. Oct 10, 2023

    Cancelled: Building - Framing

    Inspected by Bnztemp

  9. Oct 10, 2023

    Cancelled: Building - Masonry Wall Reinforcing

    Inspected by Bnztemp

  10. Oct 10, 2023

    Cancelled: Building - Roof Decking

    Inspected by Bnztemp

  11. Oct 10, 2023

    Cancelled: Building - Vertical Cells/Columns

    Inspected by Bnztemp

  12. Oct 16, 2023

    Passed: Building - Framing

    Roof Framing, Anchor Straps And Bracing, Exterior Wall Furring

    Inspected by Gary Pitzer

  13. Oct 16, 2023

    Passed: Building - Roof Decking

    Inspected by Gary Pitzer

  14. Oct 16, 2023

    Passed: Building - Vertical Cells/Columns

    Inspected by Gary Pitzer

  15. Oct 30, 2023

    Passed: Building - Framing

    Inspected by Gary Pitzer

  16. Oct 30, 2023

    Passed: Building - Roof Decking

    Inspected by Gary Pitzer

  17. Oct 30, 2023

    Passed: Electrical - 2nd Rough-In

    Inspected by Gary Pitzer

  18. Oct 30, 2023

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Gary Pitzer

  19. Oct 30, 2023

    Passed: Plumbing/Gas - Tub Set/Shower Pan

    Inspected by Gary Pitzer

  20. Oct 30, 2023

    Failed: Building - Insulation

    Non Installed

    Inspected by Gary Pitzer

  21. Nov 8, 2023

    Passed: Building - Insulation

    Eng Letter On File

    Inspected by Gary Pitzer

  22. Nov 22, 2023

    Passed: Building - Lath/Stucco

    Inspected by Gary Pitzer

  23. Nov 22, 2023

    Passed: Electrical - Permanent Power

    Inspected by Gary Pitzer

  24. Nov 22, 2023

    Release to power company

    Inspected by Gary Pitzer

  25. Dec 14, 2023

    Septic Release Inspection

    Inspected by Health Dept

  26. Dec 28, 2023

    Cancelled: Building - Insulation

    Inspected by Anthony Aslan

  27. Dec 28, 2023

    Cancelled: Building - Final

    Inspected by Anthony Aslan

  28. Jan 3, 2024

    Passed: Building - Final

    Inspected by Gary Pitzer

Documents