Permit Details

Permit Search

Permit

Roof Replacement or Repair

2584 S MARION AVE
LAKE CITY, FL 32025

Permit #
000047920
Application #
61989
Status Completed
  1. Submitted Jul 24, 2023
  2. Issued Aug 18, 2023
  3. Expires Feb 25, 2024
  4. Completed Aug 29, 2023

Property

Parcel #
08259-002
Owner
Kneppar R J & Teri L -trustees, Kneppar Teri L
Acres
0.39
Subdivision
Lakeside Heights
Zoning
CI
Flood zone
X
District
5

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0294D
Type Roofing Job
Overlay with Metal
Further Job Details (Explain if decking is being replaced and or Repairs are being done.)
complete roofover for apt 101 & 102
Type of structure
Commercial Building
Commercial or Residential
Commercial
Roof Area (for this job) Sq Ft
2900
No. of Stories
1
Roof Pitch
4:12 or Greater
Is the existing roof being removed?
No
Explain if not removing the existing roofing material?
Metal overlay
Type of New Roofing Product
Metal
Florida Product Approval Number
17992
Product Manufacturer
Capital Metal
Product Description
29 Gauge capital rib
Building Code Edition
2020 Florida Building Code 7th Edition and Florida Statute 553.844
Sealed roof decking options: (Must select an option.)
Other (explain)
Sealed roof decking explanation for other option.
Metal overlay
Ventilation:
Ridge Vent
Flashing:
Replace All
Drip Edge:
Replace All
Valley Treatment:
New Metal
Any cable and/or race-way wiring located on or within the roof assembly?
No

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. City of Lake City Utilities Notified
  4. Final Review - Documents Required
  5. Final Review - Payment Needed
  6. Permit Issued

Contractors

  • Kevin L Bedenbaugh Jr

    Plumb Level Construction Co Llc

    License
    CCC1329482
    Title
    Roofing Contractor
    Role
    Contractor

Inspections

  1. Aug 29, 2023

    Re-Roof-Final

    Small House

    Inspected by Gary Pitzer

  2. Aug 29, 2023

    Passed: Re-Roof - In Progress

    Inspected by Gary Pitzer