Permit Details

Permit Search

Permit

Roof Replacement or Repair

380 SW PHILLIPS CIR
LAKE CITY, FL 32024

Permit #
000047835
Application #
62141
Status Completed
  1. Submitted Aug 7, 2023
  2. Issued Aug 7, 2023
  3. Expires Mar 23, 2024
  4. Completed Sep 25, 2023

Property

Parcel #
02739-246
Owner
Elizee Sonet, Elizee Gertrude
Acres
0.50
Subdivision
Turkey Run
Zoning
RSF-2
Flood zone
X
District
3

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0290D
Type Roofing Job
Re-Cover - New Material over Existing
Type of structure
House
Commercial or Residential
Residential
Roof Area (for this job) Sq Ft
37
No. of Stories
1
Roof Pitch
4:12 or Greater
Is the existing roof being removed?
No
Explain if not removing the existing roofing material?
install metal over existing roof material w/ 1x4's FL 4595.20 R5
Type of New Roofing Product
Metal
Florida Product Approval Number
FL 4595.20 R5
Product Manufacturer
Tri County Metals
Product Description
Ultra Rib
Building Code Edition
2020 Florida Building Code 7th Edition and Florida Statute 553.844
Sealed roof decking options: (Must select an option.)
Other (explain)
Sealed roof decking explanation for other option.
Install metal over existing roof material w/ 1x4's FL 4595.20 R5
Ventilation:
Ridge Vent
Flashing:
Replace All
Drip Edge:
Replace All
Valley Treatment:
New Metal
Any cable and/or race-way wiring located on or within the roof assembly?
No

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. City of Lake City Utilities Notified
  4. Final Review - Payment Needed
  5. Permit Issued

Contractors

  • Benjamin T Keeler

    Keeler Roofing, Llc

    License
    CCC1330509
    Title
    Cert. Roofing
    Role
    Contractor

Inspections

  1. Sep 21, 2023

    Passed: Re-Roof - In Progress

    Furring Strips Installed And Metal Started. Please Provide Vent Opening Picture With Your Other Photos

    Inspected by Gary Pitzer

  2. Sep 25, 2023

    Passed: Re-Roof - Final

    Inspected by Gary Pitzer