| Finished floor requirement |
|
| Fema map number |
12023C0195D |
| Type Roofing Job |
Re-Cover - New Material over Existing |
| Further Job Details (Explain if decking is being replaced and or Repairs are being done.) |
Metal roof over 1x4 lath nailed 4" on center staggered with 2-3/8" ringshank nails. |
| Type of structure |
Mobile Home |
| Commercial or Residential |
Residential |
| Roof Area (for this job) Sq Ft |
1461 |
| No. of Stories |
1 |
| Roof Pitch |
2:12 to 4:12 |
| Is the existing roof being removed? |
No |
| Explain if not removing the existing roofing material? |
Its is a roof over with new metal. |
| Type of New Roofing Product |
Metal |
| Florida Product Approval Number |
# 4595.17 R5 |
| Product Manufacturer |
Tri-County Metals |
| Product Description |
Ultra Rib Panel |
| Building Code Edition |
2020 Florida Building Code 7th Edition and Florida Statute 553.844 |
| Sealed roof decking options: (Must select an option.) |
Other (explain) |
| Sealed roof decking explanation for other option. |
Roof over, no new underlayment will be installed |
| Ventilation: |
Ridge Vent |
| Flashing: |
Replace All |
| Drip Edge: |
Replace All |
| Valley Treatment: |
New Metal |
| Any cable and/or race-way wiring located on or within the roof assembly? |
No |