Roof Replacement or Repair
Permit
| Application #: | 61664 |
| Permit #: |
000047690 |
| Related Permit: |
|
| Submitted: | Tuesday, July 11, 2023 |
| Issued: | Monday, July 17, 2023 |
| Expires: | Friday, July 21, 2023 |
| Completed: | Friday, July 21, 2023 |
| Status: |
Completed |
| Septic Release? |
N/A |
Job Details
| Finished floor requirement |
|
| Fema map number |
12023C0380C |
| Type Roofing Job |
Re-Cover - New Material over Existing |
| Further Job Details (Explain if decking is being replaced and or Repairs are being done.) |
Replace wood needed |
| Type of structure |
Modular Building |
| Commercial or Residential |
Residential |
| Roof Area (for this job) Sq Ft |
0.00 |
| No. of Stories |
1 |
| Roof Pitch |
2:12 to 4:12 |
| Is the existing roof being removed? |
No |
| Explain if not removing the existing roofing material? |
Metal Roof-Over |
| Type of New Roofing Product |
Metal |
| Florida Product Approval Number |
FL13838-2 |
| Product Manufacturer |
Agrimetal |
| Product Description |
26 GA RIB |
| Building Code Edition |
2020 Florida Building Code 7th Edition and Florida Statute 553.844 |
| Sealed roof decking options: (Must select an option.) |
Other (explain) |
| Sealed roof decking explanation for other option. |
Roof-Over No underlayment needed |
| Ventilation: |
Ridge Vent |
| Flashing: |
Use Existing |
| Drip Edge: |
Replace All |
| Valley Treatment: |
New Metal |
| Any cable and/or race-way wiring located on or within the roof assembly? |
No |
Review Notes
| 6/22/2023 |
Application pending. |
| 7/11/2023 |
Application submitted by applicant. |
| 7/14/2023 |
Final Review - Documents Required |
| 7/17/2023 |
Final Review - Payment Needed |
| 7/17/2023 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Lewis G Walker Lewis Walker Roofing Inc
|
CCC1333551 |
Cert. Roofing |
Contractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Re-Roof - In Progress |
Wood Strips Nailed Over Existing Shingle Roof Covering And Metal Roofing Started |
Gary Pitzer |
7/19/2023 |
| Passed: Re-Roof - Final |
Metal Roof Marial New Boots And Trim |
Gary Pitzer |
7/21/2023 |