Permit Details

Permit Search

Permit

New Residential Construction

399 SW COVEY CT
LAKE CITY, FL 32025

Permit #
000047469
Application #
60992
Status Completed
  1. Submitted May 23, 2023
  2. Issued Jun 14, 2023
  3. Expires Jun 23, 2024
  4. Completed Dec 26, 2023

Property

Parcel #
02678-217
Owner
Carter Tammy Lee, Carter Robert
Acres
0.49
Subdivision
Covey Court
Zoning
RSF-2
Flood zone
X
District
5

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0291D
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
25'
Setback Side 1
10'
Setback Side 2
10'
Setbacks Rear
15'
Stories
1
Heated Area (Sqft)
2024
Total Area (Sqft)
2820
Building Height
21
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
23-0350
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. City of Lake City Utilities Notified
  4. Point Review - Printed-Online Application
  5. Plan Review - Building Approved
  6. Plan Review - Electrical Approved
  7. Plan Review - Mechanical Approved
  8. Plan Review - Plumbing Approved
  9. Plan Review - Fuel/Gas Approved
  10. Plan Review - Reviewed
  11. Zoning Review - Reviewed
  12. Final Review - Processing
  13. Final Review - Reviewed
  14. Final Review - Payment Needed
  15. Permit Issued
  16. Final Review - Payment Needed

Contractors

  • Bryan Zecher

    Bryan Zecher Homes Inc

    License
    CBC1257343
    Title
    Building Contractor
    Role
    Contractor
  • Donald R Hollingsworth

    Holly Electric Inc

    License
    EC13005429
    Title
    Electrical
    Role
    Subcontractor
  • Anthony R Franks

    Lane Heating & Air Llc

    License
    CAC1818631
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

    County License & State License Expired.

  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Robert Ogles

    Ogles Roofing & Construction Llc

    License
    CCC1328699
    Title
    Cert Roofing
    Role
    Subcontractor

Inspections

  1. Jun 21, 2023

    Passed: Electrical - Temporary Service

    Inspected by Troy Crews

  2. Jun 21, 2023

    Release to power company

    Inspected by Troy Crews

  3. Jun 21, 2023

    Passed: Building - Footer

    May Need Cleaning Out The Partial Footer Underwater

    Inspected by Troy Crews

  4. Jun 21, 2023

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  5. Jul 26, 2023

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Matt Forsyth

  6. Jul 31, 2023

    Passed: Building - Slab

    Inspected by Matt Forsyth

  7. Aug 16, 2023

    Passed: Building - Roof Decking

    Nice Work

    Inspected by Matt Forsyth

  8. Aug 16, 2023

    Passed: Building - Wall Sheathing

    Inspected by Matt Forsyth

  9. Aug 25, 2023

    Passed: Building - Framing

    H25 Girter Strapping (picture )needed

    Inspected by Matt Forsyth

  10. Sep 22, 2023

    Passed: Electrical - 2nd Rough-In

    Inspected by Matt Forsyth

  11. Sep 22, 2023

    Passed: Mechanical - Rough In

    Inspected by Matt Forsyth

  12. Sep 22, 2023

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Matt Forsyth

  13. Sep 28, 2023

    Passed: Building - Insulation

    Inspected by Matt Forsyth

  14. Nov 17, 2023

    Passed: Electrical - Permanent Power

    Septic Driveway Needed

    Inspected by Matt Forsyth

  15. Nov 27, 2023

    Release to power company

    Inspected by Matt Forsyth

  16. Nov 27, 2023

    Septic Release Inspection

    Inspected by Health Dept

  17. Dec 26, 2023

    Passed: Building - Final

    Inspected by Matt Forsyth

  18. Dec 26, 2023

    Cancelled: Building - Slab

    Inspected by Matt Forsyth

Documents