Permit Details

Permit Search

Permit

Mobile Home

251 NW BRONCO TER
LAKE CITY, FL 32055

Permit #
000047449
Application #
61240
Status Completed
  1. Submitted May 18, 2023
  2. Issued Jun 13, 2023
  3. Expires May 20, 2024
  4. Completed Nov 29, 2023

Property

Parcel #
02055-032
Owner
Amaru Eshu Xi,
Acres
4.77
Subdivision
Parnell Hills Unit 1
Zoning
A-3
Flood zone
X
District
1

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0280D
In floodway
N
Mobile Home is a:
Double Wide
Year Built
2023
Width (Ft.In)
32
Length (Ft.In)
64
Driveway access to home:
Existing Drive
Installation Decal #
99437
Septic #
23-0347
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Dev Permit #
F023-
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
No
Serial #
des290ga23-13145ab
Wind Zone?
2
Residential or Commercial Use?
Residential
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - On Hold-Incomplete
  4. Point Review - Printed-Online Application
  5. Point Review - Reviewed
  6. Plan Review - Reviewed
  7. Zoning Review - Reviewed
  8. Final Review - Reviewed
  9. Final Review - Payment Needed
  10. Permit Issued
  11. Final Review - Payment Needed
  12. Final Review - Payment Needed

Contractors

  • Ronald "ryan" Norris

    Norris Mobile Home Mover & Set Up

    License
    IH1135009
    Title
    Mh Installer (ih)
    Role
    Contractor

    County License & State License Expired.

  • Richard H Sapp

    Ace Electric Inc Of North Florida

    License
    EC13006007
    Title
    Electrical Contractor
    Role
    Subcontractor

    County License & State License Expired.

  • Steven M Mollman

    Mollman Air Conditioning And Refrigeration Llc

    License
    CAC1819696
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

Inspections

  1. Jun 15, 2023

    Cancelled: Mobile Home - In County Pre-Mobile Home before set-up

    Inspected by Emaleigh Williams

  2. Jun 15, 2023

    Failed: Mobile Home - Mobile Home Set-Up Final

    Mobile Home Is Not Set

    Inspected by Matt Forsyth

  3. Jun 15, 2023

    Failed: Engineering - Setbacks

    Inspected by Matt Forsyth

  4. Aug 14, 2023

    Failed: Mobile Home - Mobile Home Set-Up Final

    Need Compaction Test High Fill Dirt On Left End Of Home no Power Pedestal Built, No Wire Pulled In Side Home right End Of Home Dirt Will Allow Water To Flow Under Home wash Outs On Front And Back Of Home

    Inspected by Anthony Aslan

  5. Aug 14, 2023

    Cancelled: Engineering - Setbacks

    Inspected by Anthony Aslan

  6. Sep 13, 2023

    Failed: Mobile Home - Mobile Home Set-Up Final

    Blocking Has Washed Out In Places No Electric Work Has Been Done Swale Needed On South End Of Home

    Inspected by Matt Forsyth

  7. Sep 13, 2023

    Cancelled: Engineering - Setbacks

    Inspected by Matt Forsyth

  8. Nov 15, 2023

    Failed: Mobile Home - Mobile Home Set-Up Final

    Dirt Work Has Not Been Done As The Last Inspection Stated

    Inspected by Matt Forsyth

  9. Nov 15, 2023

    Failed: Engineering - Setbacks

    Inspected by Matt Forsyth

  10. Nov 22, 2023

    Passed: Mobile Home - Mobile Home Set-Up Final

    Need Septic Final

    Inspected by Troy Crews

  11. Nov 22, 2023

    Passed: Engineering - Setbacks

    Rec'd Septic

    Inspected by Troy Crews

  12. Nov 29, 2023

    Release to power company

    Inspected by Troy Crews

  13. Nov 29, 2023

    Certificate-Release Certificate

    Rec'd Septic Final

    Inspected by Troy Crews

  14. Nov 29, 2023

    Certificate-Release Certificate

    Rec'd Septic

    Inspected by Troy Crews

  15. Nov 30, 2023

    Septic Release Inspection

    Inspected by Health Dept