Permit Details

Permit Search

Permit

New Residential Construction

910 SW JAFUS AVE
LAKE CITY, FL 32024

Permit #
000047377
Application #
57425
Status Completed
  1. Submitted Dec 19, 2022
  2. Issued Apr 30, 2024
  3. Expires Dec 7, 2024
  4. Completed Jun 10, 2024

Property

Parcel #
00351-003
Owner
Dryden Edward, Dryden Martha G
Acres
18.96
Subdivision
—
Zoning
A-3
Flood zone
X
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0270C
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
1760
Total Area (Sqft)
4032
Building Height
18
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
23-0034
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - On Hold-Incomplete
  4. Point Review - On Hold-Incomplete
  5. Point Review - On Hold-Incomplete
  6. Point Review - On Hold-Incomplete
  7. Point Review - Printed-Online Application
  8. Point Review - Reviewed
  9. Plan Review - Corrections Needed
  10. Plan Review - Corrections Needed
  11. Plan Review - Documents Required
  12. Plan Review - Documents Required
  13. Plan Review - Building Approved
  14. Plan Review - Electrical Approved
  15. Plan Review - Mechanical Approved
  16. Plan Review - Plumbing Approved
  17. Plan Review - Fuel/Gas Approved
  18. Plan Review - Reviewed
  19. Zoning Review - Contact the Building Dept
  20. Zoning Review - Contact the Building Dept
  21. Zoning Review - Processing
  22. Zoning Review - Documents Required
  23. Zoning Review - Documents Required
  24. Zoning Review - Processing
  25. Zoning Review - Processing
  26. Zoning Review - Processing
  27. Zoning Review - Corrections Needed
  28. Zoning Review - Reviewed
  29. Final Review - Processing
  30. Final Review - Reviewed
  31. Permit Issued
  32. New address issued and ticket completed.
  33. Permit Renewed
  34. Final Review - Payment Needed

Contractors

  • Dustin Busscher

    Busscher Enterprises Llc Dba Jbc Builders

    License
    CBC1263910
    Title
    Cert. Building
    Role
    Contractor
  • Robert Jarvis

    Jarvis Heat And Air Llc

    License
    CAC1816766
    Title
    Class "b" A/c
    Role
    Subcontractor

    County License & State License Expired.

  • Curtis Graddy

    Curtis Graddy Plumbing Llc

    License
    CFC043064
    Title
    Plumbing Contractor
    Role
    Subcontractor

    County License & State License & Liability Insurance Expired.

  • Alaina Perry

    North Florida Maintenance And Repair Services Llc

    License
    ER13016315
    Title
    Reg. Electrical
    Role
    Contractor

    County License & State License Expired.

Inspections

  1. Jun 5, 2023

    Passed: Building - Footer

    8 Inch Post We're Inspected

    Inspected by Matt Forsyth

  2. Jun 5, 2023

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  3. Jul 3, 2023

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Troy Crews

  4. Jul 12, 2023

    Passed: Building - Slab

    Need Conduit Run For Island Before Placing Concrete

    Inspected by Matt Forsyth

  5. Jul 28, 2023

    Passed: Electrical - Temporary Service

    Inspected by Matt Forsyth

  6. Jul 28, 2023

    Release to power company

    Inspected by Matt Forsyth

  7. Jul 31, 2023

    Release to power company

    Inspected by Melissa Garber

  8. Oct 12, 2023

    Passed: Electrical - 2nd Rough-In

    Inspected by Matt Forsyth

  9. Oct 12, 2023

    Passed: Mechanical - Rough In

    Inspected by Matt Forsyth

  10. Oct 12, 2023

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Matt Forsyth

  11. Nov 20, 2023

    Failed: Building - Framing

    Cant See Bolts At Bottom Plate, Need Letter From Architect For Use Of 2x12 Instead Of Lvl, Also Transition Of Metal Roof Panels Need Lumber At Screw Location

    Inspected by Troy Crews

  12. Mar 18, 2024

    Failed: Electrical - Permanent Power

    Call Office Regarding New Deed And Parcel Number

    Inspected by Troy Crews

  13. May 1, 2024

    Passed: Electrical - Permanent Power

    Need Septic

    Inspected by Matt Forsyth

  14. May 14, 2024

    Release to power company

    Rec'd Septic

    Inspected by Matt Forsyth

  15. May 14, 2024

    Septic Release Inspection

    Inspected by Health Dept

  16. May 30, 2024

    Failed: Building - Final

    There Is A Failed Framing Inspection That Needs To Be Addressed

    Inspected by Matt Forsyth

  17. Jun 10, 2024

    Passed: Building - Final

    Inspected by Matt Forsyth

Documents