Permit Details

Permit Search

Permit

Mobile Home

124 SE SILKY CT
HIGH SPRINGS, FL 32643

Permit #
000047362
Application #
61141
Status Completed
  1. Submitted May 11, 2023
  2. Issued Jun 1, 2023
  3. Expires Jan 23, 2024
  4. Completed Jul 27, 2023

Property

Parcel #
09860-018
Owner
Douglas Mekenna, Beams Joshua
Acres
2.04
Subdivision
Hawks Ridge Acres
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0512C
In floodway
N
Mobile Home is a:
Double Wide
Year Built
2023
Width (Ft.In)
28
Length (Ft.In)
56
Driveway access to home:
Existing Drive
Installation Decal #
99242
Septic #
23-0354
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Dev Permit #
F023-
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
No
Serial #
FLTHLCT28191L-4441AB
Wind Zone?
2
Residential or Commercial Use?
Residential
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Printed-Online Application
  4. Point Review - Reviewed
  5. Plan Review - Reviewed
  6. Zoning Review - Reviewed
  7. Final Review - Processing
  8. Final Review - Reviewed
  9. Final Review - Payment Needed
  10. Permit Issued

Contractors

  • Robert D Sheppard

    Melvins Mobile Home Service

    License
    IH1025386
    Title
    Mh Installer (ih)
    Role
    Contractor

    County License & Liability Insurance Expired.

  • Glenn Whittington

    Whittington Electric Inc

    License
    EC13002957
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Michael A Boland

    Ace A/c Of Ocala Llc

    License
    CAC1817716
    Title
    Cert Class B A/c
    Role
    Subcontractor

Inspections

  1. May 16, 2023

    Septic Release Inspection

    Inspected by Health Dept

  2. Jul 27, 2023

    Passed: Mobile Home - Mobile Home Set-Up Final

    Inspected by Anthony Aslan

  3. Jul 27, 2023

    Release to power company

    Inspected by Anthony Aslan

  4. Jul 27, 2023

    Passed: Engineering - Setbacks

    Inspected by Anthony Aslan