| Septic Release Inspection |
|
Health Dept |
3/14/2023 |
| Passed: Engineering - Setbacks |
|
Gary Pitzer |
5/3/2023 |
| Passed: Swimming Pool - Pool Steel and Ground |
Steel Set Several Bond Wires For Future |
Gary Pitzer |
5/3/2023 |
| Passed: Electrical - Pool/Deck Bonding |
Deck Steel Bonded To Pool Walls And Bonding Ring, Long Tail To Future Equipment Area, Piping All Pressurized +45psi And Holding During Inspection |
Gary Pitzer |
5/18/2023 |
| Passed: Swimming Pool - Pool Safety and Final |
Per Install At Time Of Final |
Gary Pitzer |
8/22/2023 |