Permit Details

Permit Search

Permit

Roof Replacement or Repair

406 SW STORY PL
LAKE CITY, FL 32024

Permit #
000046897
Application #
60693
Status Completed
  1. Submitted Apr 4, 2023
  2. Issued Apr 4, 2023
  3. Expires Oct 22, 2023
  4. Completed Apr 25, 2023

Property

Parcel #
02905-414
Owner
Anderson Michael J, Anderson Jeanne M
Acres
0.56
Subdivision
Crest Pointe
Zoning
RSF-2
Flood zone
X
District
3

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0293D
Type Roofing Job
Replacement - Tear off Existing and Replace
Type of structure
House
Commercial or Residential
Residential
Roof Area (for this job) Sq Ft
31
No. of Stories
1
Roof Pitch
4:12 or Greater
Is the existing roof being removed?
Yes
Type of New Roofing Product
Asphalt Shingles
Florida Product Approval Number
FL18355-R8
Product Manufacturer
TAMKO Asphalt Shingles
Product Description
ASTM D3462 asphalt shingles and hip and ridge shingles
Building Code Edition
2020 Florida Building Code 7th Edition and Florida Statute 553.844
Sealed roof decking options: (Must select an option.)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Ventilation:
Ridge Vent
Flashing:
Use Existing
Drip Edge:
Replace All
Valley Treatment:
New Metal
Any cable and/or race-way wiring located on or within the roof assembly?
No

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Final Review - Payment Needed
  4. Permit Issued

Contractors

  • Tyler M Turner

    Tmt Roofing Llc

    License
    CCC1330410
    Title
    Cert Roofing
    Role
    Contractor

Inspections

  1. Apr 17, 2023

    Passed: Re-Roof - In Progress

    Inspected by Matt Forsyth

  2. Apr 21, 2023

    Failed: Re-Roof - Final

    Not Complete(gutter)

    Inspected by Matt Forsyth

  3. Apr 25, 2023

    Passed: Re-Roof - Final

    Inspected by Matt Forsyth