| Passed: Building - Footer |
Foyer Steer Bonded, Long Tail |
Gary Pitzer |
4/5/2023 |
| Passed: Engineering - Setbacks |
|
Gary Pitzer |
4/5/2023 |
| Passed: Electrical - Temporary Service |
|
Gary Pitzer |
4/6/2023 |
| Release to power company |
|
Gary Pitzer |
4/6/2023 |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
Drains And Vents Only, No Water Or Gas |
Gary Pitzer |
4/27/2023 |
| Passed: Building - Slab |
Plastic Down,taped And Steel |
Gary Pitzer |
5/9/2023 |
| Passed: Building - Wall Sheathing |
|
Gary Pitzer |
6/28/2023 |
| Passed: Building - Roof Decking |
|
Gary Pitzer |
6/28/2023 |
| Passed: Building - Framing |
|
Gary Pitzer |
7/14/2023 |
| Passed: Electrical - 2nd Rough-In |
|
Gary Pitzer |
8/1/2023 |
| Passed: Mechanical - Rough In |
|
Gary Pitzer |
8/1/2023 |
| Passed: Plumbing/Gas - 2nd Rough-In |
|
Gary Pitzer |
8/1/2023 |
| Passed: Building - Insulation |
Foam Walls And Roof, Draft Stopping In Place |
Gary Pitzer |
8/7/2023 |
| Passed: Building - Lath/Stucco |
|
Gary Pitzer |
8/21/2023 |
| Failed: Electrical - Permanent Power |
Need Drive Inspection, |
Gary Pitzer |
10/16/2023 |
| Septic Release Inspection |
|
Health Dept |
10/27/2023 |
| Passed: Electrical - Permanent Power |
Do Not Release Till Drive Inspection Is Complete |
Gary Pitzer |
11/2/2023 |
| Release to power company |
|
Melissa Garber |
11/7/2023 |
| Passed: Building - Final |
House Only |
Gary Pitzer |
11/30/2023 |