Permit Details

Permit Search

Permit

New Residential Construction

298 NW OVERFLOW LAKE DR
LAKE CITY, FL 32055

Permit #
000046660
Application #
58707
Status Completed
  1. Submitted Jan 23, 2023
  2. Issued Mar 7, 2023
  3. Expires Apr 28, 2024
  4. Completed Nov 2, 2023

Property

Parcel #
02611-033
Owner
Mccabe Robbie C Revocable Trust Dated September 18, 2013,
Acres
20.53
Subdivision
—
Zoning
RSF-2
Flood zone
X
District
3

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Engineers Elevation Letter
Finished floor requirement
1' ABOVE THE ADJACENT GROUND FOR ENTIRE PERIMETER
Fema map number
12023C0291D
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
25'
Setback Side 1
10'
Setback Side 2
10'
Setbacks Rear
15'
Stories
1
Heated Area (Sqft)
2835
Total Area (Sqft)
4589
Building Height
22
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
residential
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
22-1033
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Service Amps
200

Status & Review History

  1. Application pending.
  2. City of Lake City Notified of Application within Utility Service Areas LC_GAS, LC_WATER, LC_SEWER.
  3. Application submitted by applicant.
  4. City of Lake City Utilities Notified
  5. Point Review - Reviewed
  6. Point Review - Printed-Online Application
  7. Plan Review - Plumbing Approved
  8. Plan Review - Mechanical Approved
  9. Plan Review - Electrical Approved
  10. Plan Review - Building Approved
  11. Plan Review - Reviewed
  12. Zoning Review - Reviewed
  13. Final Review - Reviewed
  14. Final Review - Reviewed
  15. Final Review - Payment Needed
  16. Permit Issued
  17. Final Review - Payment Needed

Contractors

  • Bryan Zecher

    Bryan Zecher Homes Inc

    License
    CBC1257343
    Title
    Building Contractor
    Role
    Contractor
  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Robert Ogles

    Ogles Roofing & Construction Llc

    License
    CCC1328699
    Title
    Cert Roofing
    Role
    Subcontractor

    County License & State License Expired.

  • Donald R Hollingsworth

    Holly Electric Inc

    License
    EC13005429
    Title
    Electrical
    Role
    Subcontractor
  • Anthony R Franks

    Lane Heating & Air Llc

    License
    CAC1818631
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

    County License & State License Expired.

Inspections

  1. Mar 10, 2023

    Passed: Electrical - Temporary Service

    Inspected by Anthony Aslan

  2. Mar 10, 2023

    Release to power company

    Inspected by Anthony Aslan

  3. Mar 15, 2023

    Rescheduled 3/16/2023:Building - Footer

    Inspected by Anthony Aslan

  4. Mar 15, 2023

    Rescheduled 3/16/2023:Engineering - Setbacks

    Inspected by Anthony Aslan

  5. Mar 16, 2023

    Passed: Building - Footer

    Inspected by Anthony Aslan

  6. Mar 16, 2023

    Passed: Engineering - Setbacks

    Inspected by Anthony Aslan

  7. Apr 5, 2023

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Anthony Aslan

  8. Apr 10, 2023

    Passed: Building - Slab

    Inspected by Troy Crews

  9. Apr 10, 2023

    Cancelled: Building - Monolithic Slab

    Inspected by Troy Crews

  10. Apr 10, 2023

    Cancelled: Engineering - Setbacks

    Inspected by Troy Crews

  11. May 10, 2023

    Passed: Building - Roof Decking

    Inspected by Anthony Aslan

  12. May 10, 2023

    Passed: Building - Ext Strapping/Wall Sheathing

    Inspected by Anthony Aslan

  13. May 10, 2023

    Passed: Building - Framing

    Windows Not Installed

    Inspected by Anthony Aslan

  14. May 31, 2023

    Passed: Electrical - 2nd Rough-In

    Inspected by Anthony Aslan

  15. May 31, 2023

    Passed: Mechanical - Rough In

    Inspected by Anthony Aslan

  16. May 31, 2023

    Failed: Plumbing/Gas - 2nd Rough-In

    No Complete Shower Valves Not Installed no Pressure Gauge On Gas

    Inspected by Anthony Aslan

  17. May 31, 2023

    Cancelled: Plumbing/Gas - Tub Set/Shower Pan

    Inspected by Anthony Aslan

  18. Jun 8, 2023

    Passed: Plumbing/Gas - 2nd Rough-In

    Water Under Pressure, Gas Line 30 Psi.

    Inspected by Troy Crews

  19. Jun 8, 2023

    Passed: Building - Insulation

    Inspected by Troy Crews

  20. Jun 30, 2023

    Septic Release Inspection

    Inspected by Health Dept

  21. Aug 15, 2023

    Passed: Electrical - Permanent Power

    Inspected by Troy Crews

  22. Aug 15, 2023

    Release to power company

    Inspected by Troy Crews

  23. Oct 31, 2023

    Passed: Building - Final

    Waiting For Engineer Letter-- Rec'd

    Inspected by Anthony Aslan

  24. Nov 2, 2023

    Certificate-Release Certificate

    Inspected by Anthony Aslan

Documents