Mobile Home
Permit
| Application #: | 58879 |
| Permit #: |
000046598 |
| Related Permit: |
|
| Submitted: | Tuesday, January 31, 2023 |
| Issued: | Monday, February 27, 2023 |
| Expires: | Monday, April 24, 2023 |
| Completed: | Monday, April 24, 2023 |
| Status: |
Completed |
| Septic Release? |
Yes |
Job Details
| Elevation regulation |
Minimum Requirement |
| Finished floor requirement |
One foot above the road |
| Fema map number |
12023C0505C |
| In floodway |
N |
| Mobile Home is a: |
Double Wide |
| Year Built |
2022 |
| Width (Ft.In) |
32 |
| Length (Ft.In) |
56 |
| Driveway access to home: |
Existing Drive |
| Installation Decal # |
95085 |
| Septic # |
23-0099 |
| Setbacks Front |
25' |
| Setback Side 1 |
10' |
| Setbacks Rear |
15' |
| Dev Permit # |
F023- |
| Setback Side 2 |
10' |
| Are you applying for a 5 year temporary permit? |
No |
| Serial # |
DISH11895GAAB |
| Wind Zone? |
2 |
| Residential or Commercial Use? |
Residential |
| Service Amps |
200 |
Review Notes
| 1/31/2023 |
Application pending. |
| 1/31/2023 |
Application submitted by applicant. |
| 2/6/2023 |
Point Review - Printed-Online Application |
| 2/6/2023 |
Point Review - Reviewed |
| 2/8/2023 |
Plan Review - Reviewed |
| 2/8/2023 |
Zoning Review - Reviewed |
| 2/10/2023 |
Final Review - Documents Required |
| 2/10/2023 |
Final Review - Documents Required |
| 2/27/2023 |
Final Review - Reviewed |
| 2/27/2023 |
Final Review - Payment Needed |
| 2/27/2023 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Dale Houston Dale Houstons Mobile Home Set Up And Service
|
IH1025142 |
Mh Installer (ih) |
Contractor |
Glenn Whittington Whittington Electric Inc
|
EC13002957 |
Electrical Contractor |
Subcontractor |
Steven M Mollman Mollman Air Conditioning And Refrigeration Llc
|
CAC1819696 |
Cert. A/c Class “b” |
Subcontractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Mobile Home - Mobile Home Set-Up Final |
Need Picture Of Wire Pulled From Outside Panel To Inside Panel
need Septic Release |
Anthony Aslan |
4/17/2023 |
| Passed: Engineering - Setbacks |
|
Anthony Aslan |
4/17/2023 |
| Septic Release Inspection |
|
Health Dept |
4/17/2023 |
| Release to power company |
Recv'd Picture |
Anthony Aslan |
4/24/2023 |
| Certificate-Release Certificate |
Recv'd Pictures |
Anthony Aslan |
4/24/2023 |