Permit Details

Permit Search

Permit

New Residential Construction

22403 S US HIGHWAY 441
HIGH SPRINGS, FL 32643

Permit #
000046320
Application #
57312
Status Completed
  1. Submitted Dec 1, 2022
  2. Issued Jan 20, 2023
  3. Expires Apr 20, 2024
  4. Completed Oct 23, 2023

Property

Parcel #
09995-002
Owner
Walden Jerrica, Walden Matthew
Acres
21.84
Subdivision
—
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0513C
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
2092
Total Area (Sqft)
3210
Building Height
21
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
23-0031
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Printed-Online Application
  4. Plan Review - Building Approved
  5. Plan Review - Electrical Approved
  6. Plan Review - Mechanical Approved
  7. Plan Review - Plumbing Approved
  8. Plan Review - Fuel/Gas Approved
  9. Plan Review - Reviewed
  10. Zoning Review - Reviewed
  11. Final Review - Documents Required
  12. Final Review - Documents Required
  13. Final Review - Reviewed
  14. Final Review - Payment Needed
  15. Permit Issued

Contractors

  • Isaiah Cully

    Ic Construction Llc

    License
    CBC1259655
    Title
    Building Contractor
    Role
    Contractor
  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Tyler M Turner

    Tmt Roofing Llc

    License
    CCC1330410
    Title
    Cert Roofing
    Role
    Subcontractor
  • Everton D Ruddock

    D&s Lighting Inc

    License
    EC13003800
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Clinton G Wilson

    Wilson Heat & Air Inc

    License
    CAC057886
    Title
    Class B A/c
    Role
    Subcontractor

Inspections

  1. Feb 15, 2023

    Passed: Building - Footer

    No Permit Box Or Porta Potty

    Inspected by Anthony Aslan

  2. Feb 15, 2023

    Passed: Engineering - Setbacks

    Inspected by Anthony Aslan

  3. Mar 13, 2023

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Anthony Aslan

  4. Mar 16, 2023

    Passed: Building - Slab

    Inspected by Anthony Aslan

  5. Apr 12, 2023

    Failed: Electrical - Temporary Service

    No Pole

    Inspected by Anthony Aslan

  6. Apr 13, 2023

    Passed: Electrical - Temporary Service

    Inspected by Anthony Aslan

  7. Apr 13, 2023

    Release to power company

    Inspected by Anthony Aslan

  8. Apr 28, 2023

    Passed: Building - Roof Decking

    Inspected by Anthony Aslan

  9. Apr 28, 2023

    Passed: Building - Wall Sheathing

    Inspected by Anthony Aslan

  10. May 4, 2023

    Passed: Building - Framing

    Missing Anchors And Stud Pack Missing Under Double Truss

    Inspected by Anthony Aslan

  11. Jun 6, 2023

    Passed: Electrical - 2nd Rough-In

    Nipple At Panel Not Sealed, Check At Insulation

    Inspected by Anthony Aslan

  12. Jun 6, 2023

    Passed: Mechanical - Rough In

    Screws In Kitchen Exhaust Pipe Joints nail Guards Missing On Dryer Pipe osa Damper Installed

    Inspected by Anthony Aslan

  13. Jun 6, 2023

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Anthony Aslan

  14. Jul 7, 2023

    Passed: Building - Insulation

    Spray Foam Attic

    Inspected by Anthony Aslan

  15. Oct 9, 2023

    Passed: Electrical - Permanent Power

    Need Septic Release

    Inspected by Anthony Aslan

  16. Oct 11, 2023

    Release to power company

    Inspected by Melissa Garber

  17. Oct 11, 2023

    Septic Release Inspection

    Inspected by Health Dept

  18. Oct 20, 2023

    Failed: Building - Final

    Master Tub Not Set no Back Flow Preventers On Hose Bibs no Final Termite

    Inspected by Anthony Aslan

  19. Oct 23, 2023

    Passed: Building - Final

    Inspected by Anthony Aslan

Documents