Permit Details

Permit Search

Permit

New Residential Construction

152 SE SCHNEIDERS GLN
LAKE CITY, FL 32025

Permit #
000046289
Application #
57130
Status Completed
  1. Submitted Dec 13, 2022
  2. Issued Jan 18, 2023
  3. Expires Feb 17, 2024
  4. Completed Aug 21, 2023

Property

Parcel #
08825-011
Owner
Schneiders Mark D, Schneiders Kimberly M
Acres
9.22
Subdivision
—
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Engineers Elevation Letter
Finished floor requirement
1' ABOVE ADJACENT GROUND
Fema map number
12023C0401C
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
2405
Total Area (Sqft)
3550
Building Height
21
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
22-0919
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Printed-Online Application
  4. Point Review - Reviewed
  5. Plan Review - Building Approved
  6. Plan Review - Electrical Approved
  7. Plan Review - Mechanical Approved
  8. Plan Review - Plumbing Approved
  9. Plan Review - Fuel/Gas Approved
  10. Plan Review - Reviewed
  11. Zoning Review - Reviewed
  12. Final Review - Documents Required
  13. Final Review - Documents Required
  14. Final Review - Reviewed
  15. Permit Issued

Contractors

  • Bryan Zecher

    Bryan Zecher Construction Inc

    License
    CBC054575
    Title
    Cert.building Contractor
    Role
    Contractor
  • Donald R Hollingsworth

    Holly Electric Inc

    License
    EC13005429
    Title
    Electrical
    Role
    Subcontractor
  • Anthony R Franks

    Lane Heating & Air Llc

    License
    CAC1818631
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

    County License & State License Expired.

  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Robert Ogles

    Ogles Roofing & Construction Llc

    License
    CCC1328699
    Title
    Cert Roofing
    Role
    Subcontractor

    County License & State License Expired.

Inspections

  1. Jan 24, 2023

    Passed: Electrical - Temporary Service

    Inspected by Anthony Aslan

  2. Jan 24, 2023

    Release to power company

    Inspected by Anthony Aslan

  3. Feb 3, 2023

    Passed: Building - Footer

    Inspected by Anthony Aslan

  4. Feb 3, 2023

    Passed: Engineering - Setbacks

    Inspected by Anthony Aslan

  5. Feb 24, 2023

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Anthony Aslan

  6. Mar 2, 2023

    Passed: Building - Slab

    Inspected by Anthony Aslan

  7. Apr 3, 2023

    Passed: Building - Roof Decking

    Inspected by Anthony Aslan

  8. Apr 3, 2023

    Passed: Building - Wall Sheathing

    Inspected by Anthony Aslan

  9. Apr 27, 2023

    Passed: Building - Framing

    Inspected by Anthony Aslan

  10. Apr 27, 2023

    Passed: Electrical - 2nd Rough-In

    Inspected by Anthony Aslan

  11. Apr 27, 2023

    Passed: Mechanical - Rough In

    Inspected by Anthony Aslan

  12. Apr 27, 2023

    Failed: Plumbing/Gas - 2nd Rough-In

    Missing Nail Guards

    Inspected by Anthony Aslan

  13. May 1, 2023

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Anthony Aslan

  14. May 5, 2023

    Passed: Building - Insulation

    Walls Only

    Inspected by Anthony Aslan

  15. Jul 7, 2023

    Passed: Electrical - Permanent Power

    Need Septic Release

    Inspected by Anthony Aslan

  16. Jul 11, 2023

    Septic Release Inspection

    Inspected by Health Dept

  17. Jul 13, 2023

    Release to power company

    Septic Received

    Inspected by Troy Crews

  18. Jul 14, 2023

    Failed: Building - Final

    No Power On House

    Inspected by Anthony Aslan

  19. Aug 21, 2023

    Passed: Building - Final

    Master Bedroom Not Arc Fault Protected

    Inspected by Anthony Aslan

Documents