Permit Details

Permit Search

Permit

Mobile Home

8698 NW US HIGHWAY 41
LAKE CITY, FL 32055

Permit #
000046207
Application #
57462
Status Completed
  1. Submitted Dec 16, 2022
  2. Issued Jan 18, 2023
  3. Expires Jul 26, 2023
  4. Completed Jan 27, 2023

Property

Parcel #
01706-000
Owner
Hanna Thomas J, Hanna Martha L
Acres
1.40
Subdivision
Suwannee Valley Estates Unr
Zoning
A-3
Flood zone
X
District
1

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Engineers Elevation Letter
Finished floor requirement
24 INCHES ABOVE THE HIGHEST ADJACENT GRADE
Fema map number
12023C0187D
In floodway
N
Mobile Home is a:
Double Wide
Year Built
2023
Width (Ft.In)
28
Length (Ft.In)
44
Driveway access to home:
Existing Drive
Installation Decal #
95052
Septic #
22-1006
Setbacks Front
30
Setback Side 1
25
Setbacks Rear
25
Dev Permit #
F023-
Setback Side 2
25
Are you applying for a 5 year temporary permit?
No
Serial #
LOHGA20038720AB
Wind Zone?
2
Residential or Commercial Use?
Residential
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Printed-Online Application
  4. Plan Review - Reviewed
  5. Zoning Review - Reviewed
  6. Final Review - Documents Required
  7. Final Review - Documents Required
  8. Final Review - Documents Required
  9. Final Review - Reviewed
  10. Final Review - Payment Needed
  11. Permit Issued
  12. Permit Reissued

Contractors

  • David Albright

    David Albright Mobile Home Svc Llc

    License
    IH1129420
    Title
    Mh Installer (ih)
    Role
    Contractor
  • Glenn Whittington

    Whittington Electric Inc

    License
    EC13002957
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Harry D Moseley Sr

    Harrys Heating & Air Conditioning Inc

    License
    RA0030316
    Title
    Class A A/c Contractor
    Role
    Subcontractor

    County License & State License Expired.

Inspections

  1. Jan 27, 2023

    Passed: Mobile Home - Mobile Home Set-Up Final

    Inspected by Troy Crews

  2. Jan 27, 2023

    Release to power company

    Inspected by Troy Crews

  3. Jan 27, 2023

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  4. Feb 14, 2023

    Septic Release Inspection

    Inspected by Health Dept