| Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Anthony Aslan |
11/22/2022 |
| Passed: Building - Monolithic Slab |
|
Anthony Aslan |
11/30/2022 |
| Passed: Engineering - Setbacks |
|
Anthony Aslan |
11/30/2022 |
| Passed: Building - Footer |
Front Porch |
Anthony Aslan |
12/12/2022 |
| Passed: Engineering - Setbacks |
|
Anthony Aslan |
12/12/2022 |
| Passed: Building - Framing |
Roof Mailings Only |
Gary Pitzer |
1/6/2023 |
| Passed: Plumbing/Gas - 2nd Rough-In |
Pressure Test On |
Gary Pitzer |
2/3/2023 |
| Passed: Building - Framing |
|
Gary Pitzer |
2/3/2023 |
| Passed: Electrical - 2nd Rough-In |
|
Gary Pitzer |
2/3/2023 |
| Cancelled: Building - Insulation |
Mistake |
Gary Pitzer |
2/7/2023 |
| Passed: Building - Insulation |
Walls Only , Ceilings Will Be Blown |
Gary Pitzer |
2/7/2023 |
| Cancelled: Building - Insulation |
Mistake |
Gary Pitzer |
2/7/2023 |
| Failed: Mechanical - Rough In |
Several Places That Straps And Or Other Ducts Have Ducts Collapsed |
Gary Pitzer |
2/7/2023 |
| Passed: Electrical - Permanent Power |
|
Gary Pitzer |
2/8/2023 |
| Release to power company |
|
Gary Pitzer |
2/8/2023 |
| Passed: Mechanical - Rough In |
|
Gary Pitzer |
2/8/2023 |
| Septic Release Inspection |
|
Health Dept |
2/14/2023 |
| Passed: Building - Final |
|
Gary Pitzer |
5/8/2023 |