Permit Details

Permit Search

Permit

New Residential Construction

523 SW UPSTAGE GLN
LAKE CITY, FL 32024

Permit #
000045827
Application #
56246
Status Completed
  1. Submitted Aug 26, 2022
  2. Issued Nov 1, 2022
  3. Expires Feb 14, 2024
  4. Completed Aug 18, 2023

Property

Parcel #
09280-151
Owner
Knoll Darren, Knoll Silja
Acres
9.52
Subdivision
Oaks Of Lake City Phase 1
Zoning
PRRD
Flood zone
X
District
5

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Subdivision Plat
Finished floor requirement
75'
Requirement needed
By Nailing Inspection
Document needed is
a Surveyor letter giving the Finished Floor Elevation
Document receieved
Yes
Fema map number
12023C0395C
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
3155
Total Area (Sqft)
5147
Building Height
228
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
22-0793
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Point Review - Printed-Online Application
  3. Point Review - Reviewed
  4. Plan Review - Corrections Needed
  5. Plan Review - Building Approved
  6. Plan Review - Electrical Approved
  7. Plan Review - Mechanical Approved
  8. Plan Review - Plumbing Approved
  9. Plan Review - Fuel/Gas Approved
  10. Plan Review - Reviewed
  11. Zoning Review - Reviewed
  12. Final Review - Documents Required
  13. Final Review - Reviewed
  14. Final Review - Payment Needed
  15. Permit Issued
  16. Final Review - Corrections Needed

Contractors

  • Isaiah Cully

    Ic Construction Llc

    License
    CBC1259655
    Title
    Building Contractor
    Role
    Contractor
  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Tyler M Turner

    Tmt Roofing Llc

    License
    CCC1330410
    Title
    Cert Roofing
    Role
    Subcontractor
  • Everton D Ruddock

    D&s Lighting Inc

    License
    EC13003800
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Clinton G Wilson

    Wilson Heat & Air Inc

    License
    CAC057886
    Title
    Class B A/c
    Role
    Subcontractor

Inspections

  1. Nov 9, 2022

    Passed: Building - Footer

    Inspected by Troy Crews

  2. Nov 9, 2022

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  3. Nov 9, 2022

    Passed: Electrical - Temporary Service

    Inspected by Troy Crews

  4. Nov 9, 2022

    Release to power company

    Inspected by Troy Crews

  5. Dec 30, 2022

    Rescheduled 12/30/2022:Plumbing/Gas - 1st Underground Rough–In

    Inspected by Troy Crews

  6. Dec 30, 2022

    Failed: Plumbing/Gas - 1st Underground Rough–In

    No Water Test Call Back In With Slab Must Be Full For Slab Inspection.

    Inspected by Troy Crews

  7. Jan 3, 2023

    Failed: Building - Slab

    Plumbing Not Requested And No Water Test On Plumbing.

    Inspected by Troy Crews

  8. Jan 5, 2023

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Troy Crews

  9. Jan 5, 2023

    Passed: Building - Slab

    Water Test On Plumbing Now.

    Inspected by Troy Crews

  10. Mar 10, 2023

    Failed: Building - Framing

    Not Ready

    Inspected by Gary Pitzer

  11. Mar 10, 2023

    Failed: Mechanical - Rough In

    Not. Ready

    Inspected by Gary Pitzer

  12. Mar 10, 2023

    Failed: Plumbing/Gas - 2nd Rough-In

    Not Ready

    Inspected by Gary Pitzer

  13. Mar 27, 2023

    Failed: Building - Framing

    Missing Truss Bracing In Loft Area Above Garage

    Inspected by Gary Pitzer

  14. Mar 27, 2023

    Passed: Electrical - 2nd Rough-In

    Inspected by Gary Pitzer

  15. Mar 27, 2023

    Failed: Mechanical - Rough In

    1.duct In Loft Araa Above Garage Crushed, 2 Exhaust Vent Pipe In Masted Bath Need Extra Pipe Remove

    Inspected by Gary Pitzer

  16. Mar 27, 2023

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Gary Pitzer

  17. Apr 4, 2023

    Passed: Mechanical - Rough In

    Inspected by Gary Pitzer

  18. Apr 4, 2023

    Passed: Building - Framing

    Inspected by Gary Pitzer

  19. Apr 6, 2023

    Failed: Building - Insulation

    Must Complete Mechanicals And Framing Prior To Insulation

    Inspected by Troy Crews

  20. Apr 6, 2023

    Passed: Building - Insulation

    Inspected by Gary Pitzer

  21. Jun 23, 2023

    Passed: Electrical - Permanent Power

    Inspected by Gary Pitzer

  22. Jun 23, 2023

    Release to power company

    Inspected by Gary Pitzer

  23. Jul 19, 2023

    Septic Release Inspection

    Inspected by Health Dept

  24. Aug 14, 2023

    Failed: Building - Final

    Handrail To Up Second Floor Does Not Extend Full Length Of Stairs, Need Outlet Added To Counter Top Under Window, Kitchen Outlets Need Arc-fault Protection, No Shut Off Valve On Gas Cook Stove. This For House Only

    Inspected by Gary Pitzer

  25. Aug 15, 2023

    Rescheduled 8/18/2023:Building - Final

    Inspected by Gary Pitzer

  26. Aug 18, 2023

    Passed: Building - Final

    Inspected by Gary Pitzer

Documents