Permit Details

Permit Search

Permit

New Residential Construction

1505 SW DAISY RD
LAKE CITY, FL 32024

Permit #
000045716
Application #
56132
Status Permit Issued This permit expired on Feb 20, 2024.
  1. Submitted Aug 17, 2022
  2. Issued Oct 19, 2022
  3. Expires Feb 20, 2024
  4. Completed —

Property

Parcel #
00478-107
Owner
Brian Laflamme
Acres
10.00
Subdivision
Daisy Estates Unr
Zoning
ESA-2
Flood zone
X
District
2

Permit

Status
Permit Issued
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0370C
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
1293
Total Area (Sqft)
1904
Building Height
19
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
22-0712
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Point Review - Printed-Online Application
  3. Plan Review - Corrections Needed
  4. Plan Review - Corrections Needed
  5. Plan Review - Building Approved
  6. Plan Review - Electrical Approved
  7. Plan Review - Mechanical Approved
  8. Plan Review - Plumbing Approved
  9. Zoning Review - Reviewed
  10. Final Review - Documents Required
  11. Final Review - Documents Required
  12. Plan Review - Building Approved
  13. Plan Review - Electrical Approved
  14. Plan Review - Mechanical Approved
  15. Plan Review - Fuel/Gas Approved
  16. Plan Review - Reviewed
  17. Final Review - Reviewed
  18. Final Review - Payment Needed
  19. Permit Issued

Contractors

  • William S Crawford

    Stanley Crawford Construction Inc

    License
    RG0042896
    Title
    General Contractor
    Role
    Contractor

    County License & State License & Liability Insurance & Workers Comp & Employees Workers Comp Expired.

  • Don C Bills Sr

    Hometown Plumbing Services Llc

    License
    CFC1428890
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Ralph W Laverdure

    Rwl Roofing Llc

    License
    CCC1328590
    Title
    Roofing Contractor
    Role
    Subcontractor

    County License & State License & Liability Insurance & Workers Comp Expired.

  • Donald Davis

    High Springs Electric Inc

    License
    EC0002306
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Stephen M Brisbois

    Epic Ac Service (dba) Central Home Heating & Air Llc

    License
    CAC1819412
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

Inspections

  1. Oct 31, 2022

    Passed: Building - Footer

    Inspected by Matt Forsyth

  2. Oct 31, 2022

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  3. Nov 29, 2022

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Matt Forsyth

  4. Nov 29, 2022

    Failed: Electrical - Temporary Service

    No Work Done

    Inspected by Matt Forsyth

  5. Dec 5, 2022

    Passed: Building - Slab

    Inspected by Matt Forsyth

  6. Dec 28, 2022

    Passed: Electrical - Temporary Service

    Inspected by Matt Forsyth

  7. Dec 28, 2022

    Release to power company

    Inspected by Matt Forsyth

  8. Jan 17, 2023

    Passed: Building - Ext Strapping/Wall Sheathing

    Inspected by Matt Forsyth

  9. Jan 17, 2023

    Passed: Building - Roof Decking

    Inspected by Matt Forsyth

  10. Feb 23, 2023

    Passed: Building - Framing

    Inspected by Matt Forsyth

  11. Feb 23, 2023

    Passed: Electrical - 2nd Rough-In

    Inspected by Matt Forsyth

  12. Feb 23, 2023

    Passed: Mechanical - Rough In

    Duckwork For Dryer Vent And Stove Top Have Come Loose Will Check On Insulation Inspection

    Inspected by Matt Forsyth

  13. Feb 23, 2023

    Passed: Plumbing/Gas - 2nd Rough-In

    Tub Water Tested

    Inspected by Matt Forsyth

  14. Mar 3, 2023

    Passed: Building - Insulation

    Inspected by Matt Forsyth

  15. Aug 24, 2023

    Passed: Electrical - Permanent Power

    Need Septic Release

    Inspected by Matt Forsyth

  16. Aug 29, 2023

    Septic Release Inspection

    Inspected by Health Dept

  17. Sep 28, 2023

    Release to power company

    Inspected by Melissa Garber

Documents