Permit Details

Permit Search

Permit

Roof Replacement or Repair

291 SE CLARENCE CT
LAKE CITY, FL 32025

Permit #
000045641
Application #
56717
Status Completed
  1. Submitted Oct 7, 2022
  2. Issued Oct 7, 2022
  3. Expires Apr 29, 2023
  4. Completed Oct 31, 2022

Property

Parcel #
09208-203
Owner
Baltzley Steven L, Baltzley Valerie A
Acres
4.76
Subdivision
Myrtis Estates Unit 2
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0405C
Type Roofing Job
Overlay with Metal
Type of structure
House
Commercial or Residential
Residential
Roof Area (for this job) Sq Ft
29
No. of Stories
1
Roof Pitch
4:12 or Greater
Is the existing roof being removed?
No
Type of New Roofing Product
Metal
Florida Product Approval Number
FL17992.1 R3
Product Manufacturer
Capital Metal Supply, Inc.
Product Description
Min. 29 Ga. Capital Rib Roof Panel over 1x4 Wood Purlins over 7/16” OSB
Building Code Edition
2020 Florida Building Code 7th Edition and Florida Statute 553.844
Sealed roof decking options: (Must select an option.)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Ventilation:
Ridge Vent
Flashing:
Use Existing
Drip Edge:
Replace All
Valley Treatment:
New Metal
Any cable and/or race-way wiring located on or within the roof assembly?
No

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Final Review - Payment Needed
  4. Permit Issued

Contractors

  • Tyler M Turner

    Tmt Roofing Llc

    License
    CCC1330410
    Title
    Cert Roofing
    Role
    Contractor

Inspections

  1. Oct 24, 2022

    Rescheduled 10/25/2022:Re-Roof - In Progress

    Inspected by Emaleigh Williams

  2. Oct 25, 2022

    Passed: Re-Roof - In Progress

    Inspected by Anthony Aslan

  3. Oct 31, 2022

    Passed: Re-Roof - Final

    Inspected by Anthony Aslan