| Septic Release Inspection |
|
Health Dept |
9/26/2022 |
| Cancelled: Building - Final |
|
Emaleigh Williams |
6/5/2023 |
| Cancelled: Building - Pre-Certificate Public Works Inspection |
|
Emaleigh Williams |
6/5/2023 |
| Passed: Building - Monolithic Slab |
Future Plumbing Was Installed |
Matt Forsyth |
9/11/2023 |
| Passed: Engineering - Setbacks |
|
Matt Forsyth |
9/11/2023 |
| Passed: Building - Final |
|
Matt Forsyth |
10/9/2023 |
| Failed: Electrical - Utility Pole Final |
No Neutral Wire In Meter Can |
Matt Forsyth |
10/9/2023 |
| Passed: Electrical - Utility Pole Final |
|
Matt Forsyth |
10/25/2023 |
| Release to power company |
|
Matt Forsyth |
10/25/2023 |