Permit Details

Permit Search

Permit

Mobile Home

11640 SW TUSTENUGGEE AVE
FORT WHITE, FL 32038

Permit #
000045539
Application #
56050
Status Completed
  1. Submitted Aug 13, 2022
  2. Issued Sep 22, 2022
  3. Expires May 31, 2023
  4. Completed Dec 2, 2022

Property

Parcel #
09621-114
Owner
Quintero Mary, Quintero Michael Dominick
Acres
4.98
Subdivision
Tustenuggee Ridge
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0485C
In floodway
N
Mobile Home is a:
Double Wide
Year Built
2023
Width (Ft.In)
32
Length (Ft.In)
76
Driveway access to home:
Existing Drive
Installation Decal #
88703
Special temporary use permit number:
STUP2208-44
Septic #
22-0751
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Dev Permit #
F023-
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
Yes
Serial #
LOHGA20022883AB
Wind Zone?
2
Residential or Commercial Use?
Residential
Service Amps
200

Status & Review History

  1. Application pending.
  2. Point Review - Printed-Online Application
  3. Point Review - Reviewed
  4. Plan Review - Reviewed
  5. Zoning Review - Reviewed
  6. Final Review - Documents Required
  7. Final Review - Documents Required
  8. Final Review - Reviewed
  9. Final Review - Payment Needed
  10. Permit Issued

Contractors

  • Brent M Strickland

    License
    IH1104218
    Title
    Mh Installer (ih)
    Role
    Contractor
  • Glenn Whittington

    Whittington Electric Inc

    License
    EC13002957
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Ronald E Bonds Sr

    Style Crest Inc

    License
    CAC1817658
    Title
    Class "b" A/c Contractor
    Role
    Subcontractor

    County License & State License Expired.

Inspections

  1. Sep 26, 2022

    Septic Release Inspection

    Inspected by Health Dept

  2. Nov 30, 2022

    Passed: Engineering - Setbacks

    Inspected by Anthony Aslan

  3. Nov 30, 2022

    Passed: Mobile Home - Mobile Home Set-Up Final

    Septic Not Connected To Trailer, A/c Ducts On Ground Need 4" Clearance

    Inspected by Anthony Aslan

  4. Dec 2, 2022

    Passed: Mobile Home - Mobile Home Set-Up Final

    Inspected by Anthony Aslan

  5. Dec 2, 2022

    Release to power company

    Inspected by Anthony Aslan

  6. Dec 2, 2022

    Passed: Engineering - Setbacks

    Inspected by Anthony Aslan