Mobile Home
Permit
| Application #: | 55507 |
| Permit #: |
000045532 |
| Related Permit: |
|
| Submitted: | Tuesday, July 5, 2022 |
| Issued: | Thursday, September 22, 2022 |
| Expires: | Wednesday, December 21, 2022 |
| Completed: | Wednesday, December 21, 2022 |
| Status: |
Completed |
| Septic Release? |
Yes |
Job Details
| Elevation regulation |
Minimum Requirement |
| Finished floor requirement |
One foot above the road |
| Mobile Home is a: |
Double Wide |
| Year Built |
1998 |
| Width (Ft.In) |
48 |
| Length (Ft.In) |
24 |
| Driveway access to home: |
Existing Drive |
| Installation Decal # |
92026 |
| Septic # |
22-0586 |
| Setbacks Front |
30' |
| Setback Side 1 |
25' |
| Setbacks Rear |
25' |
| Dev Permit # |
F023- |
| Setback Side 2 |
25' |
| Are you applying for a 5 year temporary permit? |
No |
| Serial # |
fla14612955ab |
| Wind Zone? |
2 |
| Residential or Commercial Use? |
Residential |
Review Notes
| 7/5/2022 |
Point Review - Printed-Online Application |
| 7/5/2022 |
Point Review - Reviewed |
| 7/6/2022 |
Plan Review - Reviewed |
| 7/8/2022 |
Zoning Review - Corrections Needed |
| 7/13/2022 |
Zoning Review - Corrections Needed |
| 7/14/2022 |
Zoning Review - Documents Required |
| 7/14/2022 |
Zoning Review - Documents Required |
| 7/15/2022 |
Zoning Review - Reviewed |
| 7/15/2022 |
Final Review - Reviewed |
| 7/20/2022 |
Final Review - Corrections Needed |
| 9/21/2022 |
Final Review - Reviewed |
| 9/21/2022 |
Final Review - Payment Needed |
| 9/22/2022 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Ronald "ryan" Norris Norris Mobile Home Mover & Set Up
|
IH1135009 |
Mh Installer (ih) |
Contractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Mobile Home - In County Pre-Mobile Home before set-up |
|
Anthony Aslan |
9/9/2022 |
| Passed: Engineering - Setbacks |
|
Anthony Aslan |
12/7/2022 |
| Passed: Mobile Home - Mobile Home Set-Up Final |
Ground Is Not Landed On Nuetral Bar Of Panel.
hole In Bottom Of Panel Is Not Sealed You Can Not Lay Knock Out Over Connector. |
Anthony Aslan |
12/7/2022 |
| Septic Release Inspection |
|
Health Dept |
12/9/2022 |
| Release to power company |
Rec'vd Pictures |
Anthony Aslan |
12/21/2022 |
| Certificate-Release Certificate |
Rec'vd Pictures |
Anthony Aslan |
12/21/2022 |