Permit Details

Permit Search

Permit

Mobile Home

289 SW GRANT GLN
LAKE CITY, FL 32024

Permit #
000045396
Application #
56171
Status Completed
  1. Submitted Aug 22, 2022
  2. Issued Sep 8, 2022
  3. Expires Jun 25, 2023
  4. Completed Jan 17, 2023

Property

Parcel #
09477-203
Owner
Wyers David A
Acres
5.68
Subdivision
Pleasant Acres
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Engineers Elevation Letter
Finished floor requirement
82.50
Requirement needed
By Final Inspection
Document needed is
a Surveyor letter giving the Finished Floor Elevation
Document receieved
Yes
Fema map number
12023C0395C
In floodway
N
Mobile Home is a:
Double Wide
Year Built
2022
Width (Ft.In)
32
Length (Ft.In)
64
Driveway access to home:
Private Drive
Installation Decal #
92598
Septic #
21-0328
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Dev Permit #
F023-
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
No
Serial #
DVAL12209833AB
Wind Zone?
2
Residential or Commercial Use?
Residential
Service Amps
200

Status & Review History

  1. Application pending.
  2. Point Review - Printed-Online Application
  3. Plan Review - Reviewed
  4. Zoning Review - Reviewed
  5. Final Review - Documents Required
  6. Final Review - Documents Required
  7. Final Review - Reviewed
  8. Permit Issued

Contractors

  • Ernest S Johnson

    Dependable Mobile Home Service

    License
    IH1025249
    Title
    Mh Installer (ih)
    Role
    Contractor

    County License & State License Expired.

  • Glenn Whittington

    Whittington Electric Inc

    License
    EC13002957
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Timothy D Shatto

    Shatto Heating & Air, Inc.

    License
    CAC057875
    Title
    A/c Class B
    Role
    Subcontractor

Inspections

  1. Dec 27, 2022

    Passed: Mobile Home - Mobile Home Set-Up Final

    Need Septic Release

    Inspected by Anthony Aslan

  2. Dec 27, 2022

    Passed: Engineering - Setbacks

    Inspected by Anthony Aslan

  3. Jan 17, 2023

    Release to power company

    Inspected by Melissa Garber

  4. Jan 17, 2023

    Certificate-Release Certificate

    Inspected by Anthony Aslan

  5. Jan 17, 2023

    Septic Release Inspection

    Inspected by Health Dept