Permit Details

Permit Search

Permit

Roof Replacement or Repair

838 SW WAVERLY LN
LAKE CITY, FL 32024

Permit #
000045387
Application #
56366
Status Completed
  1. Submitted Sep 7, 2022
  2. Issued Sep 7, 2022
  3. Expires Apr 8, 2023
  4. Completed Oct 10, 2022

Property

Parcel #
00307-005
Owner
Rosier Leandous W Jr
Acres
34.03
Subdivision
—
Zoning
A-3
Flood zone
X
District
2

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0270C
Type Roofing Job
Overlay with Metal
Type of structure
Storage or Garage Building
Commercial or Residential
Residential
Roof Area (for this job) Sq Ft
0.00
No. of Stories
1
Roof Pitch
4:12 or Greater
Is the existing roof being removed?
No
Type of New Roofing Product
Metal
Florida Product Approval Number
FL17992-1 R3
Product Manufacturer
Capital Metal Supply, INC.
Product Description
Min. 19 Ga. Capital Rib Roof Panel over 1x4 Wood Purlins over 7/16" OSB
Building Code Edition
2020 Florida Building Code 7th Edition and Florida Statute 553.844
Sealed roof decking options: (Must select an option.)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Ventilation:
Ridge Vent
Flashing:
Use Existing
Drip Edge:
Replace All
Valley Treatment:
New Metal

Status & Review History

  1. Application pending.
  2. Point Review - Processing
  3. Final Review - Documents Required
  4. Final Review - Reviewed
  5. Final Review - Payment Needed
  6. Permit Issued

Contractors

  • Tyler M Turner

    Tmt Roofing Llc

    License
    CCC1330410
    Title
    Cert Roofing
    Role
    Contractor

Inspections

  1. Sep 27, 2022

    Passed: Re-Roof - In Progress

    Roof Complete Affidavit And Pictures Needed For Final

    Inspected by Matt Forsyth

  2. Oct 10, 2022

    Passed: Re-Roof - Final

    Inspected by Matt Forsyth