Permit Details

Permit Search

Permit

Roof Replacement or Repair

330 SE EVERGREEN DR
LAKE CITY, FL 32025

Permit #
000045374
Application #
56282
Status Completed
  1. Submitted Sep 1, 2022
  2. Issued Sep 6, 2022
  3. Expires Mar 12, 2023
  4. Completed Sep 13, 2022

Property

Parcel #
07766-000
Owner
Gardner Victoria M
Acres
0.24
Subdivision
Forest Hills Unit 1
Zoning
—
Flood zone
X
District
5

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0292D
Type Roofing Job
Re-Cover - New Material over Existing
Further Job Details (Explain if decking is being replaced and or Repairs are being done.)
Replace wood as needed
Type of structure
House
Commercial or Residential
Residential
Roof Area (for this job) Sq Ft
27
No. of Stories
1
Roof Pitch
4:12 or Greater
Is the existing roof being removed?
Yes
Type of New Roofing Product
Asphalt Shingles
Florida Product Approval Number
10124-R29
Other Roofing Product Type Not Listed
3 SQ Low slope Mateials
Product Manufacturer
GAF
Product Description
TIMBERLINE HDZ
Building Code Edition
2020 Florida Building Code 7th Edition and Florida Statute 553.844
Sealed roof decking options: (Must select an option.)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Ventilation:
Ridge Vent
Flashing:
Use Existing
Drip Edge:
Replace All
Valley Treatment:
New Mineral Surface
Any cable and/or race-way wiring located on or within the roof assembly?
No

Status & Review History

  1. Application pending.
  2. City of Lake City
  3. Final Review - Corrections Needed
  4. Final Review - Documents Required
  5. Final Review - Payment Needed
  6. Permit Issued

Contractors

  • Lewis G Walker

    Lewis Walker Roofing Inc

    License
    CCC1333551
    Title
    Cert. Roofing
    Role
    Contractor

Inspections

  1. Sep 7, 2022

    Passed: Re-Roof - In Progress

    Inspected by Anthony Aslan

  2. Sep 13, 2022

    Passed: Re-Roof - Final

    Inspected by Troy Crews