Permit Details

Permit Search

Permit

New Residential Construction

528 SW UPSTAGE GLN
LAKE CITY, FL 32024

Permit #
000045339
Application #
55375
Status Completed
  1. Submitted Jul 7, 2022
  2. Issued Aug 30, 2022
  3. Expires Oct 25, 2023
  4. Completed Apr 28, 2023

Property

Parcel #
09280-140
Owner
Judson Robert P, Judson Kimberly M
Acres
4.67
Subdivision
Oaks Of Lake City Phase 1
Zoning
PRRD
Flood zone
X
District
5

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Subdivision Plat
Finished floor requirement
77'
Requirement needed
By Nailing Inspection
Document needed is
a Surveyor letter giving the Finished Floor Elevation
Document receieved
Yes
Fema map number
12023C0395C
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
30
Setback Side 1
25
Setback Side 2
25
Setbacks Rear
25
Stories
1
Heated Area (Sqft)
2688
Total Area (Sqft)
4170
Building Height
25
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
22-0536
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Point Review - Printed-Online Application
  3. Plan Review - Documents Required
  4. Plan Review - Building Approved
  5. Plan Review - Electrical Approved
  6. Plan Review - Mechanical Approved
  7. Plan Review - Plumbing Approved
  8. Plan Review - Fuel/Gas Approved
  9. Plan Review - Reviewed
  10. Zoning Review - Reviewed
  11. Final Review - Reviewed
  12. Final Review - Reviewed
  13. Final Review - Payment Needed
  14. Permit Issued
  15. Final Review - Payment Needed

Contractors

  • Bryan Zecher

    Bryan Zecher Homes Inc

    License
    CBC1257343
    Title
    Building Contractor
    Role
    Subcontractor
  • Anthony R Franks

    Lane Heating & Air Llc

    License
    CAC1818631
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

    County License & State License Expired.

  • Donald R Hollingsworth

    Holly Electric Inc

    License
    EC13005429
    Title
    Electrical
    Role
    Subcontractor
  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Robert Ogles

    Ogles Roofing & Construction Llc

    License
    CCC1328699
    Title
    Cert Roofing
    Role
    Subcontractor

    County License & State License Expired.

Inspections

  1. Sep 12, 2022

    Passed: Building - Footer

    Inspected by Troy Crews

  2. Sep 12, 2022

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  3. Sep 26, 2022

    Passed: Electrical - Temporary Service

    Inspected by Troy Crews

  4. Sep 26, 2022

    Release to power company

    Inspected by Troy Crews

  5. Oct 11, 2022

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Troy Crews

  6. Oct 14, 2022

    Passed: Building - Slab

    Inspected by Troy Crews

  7. Nov 22, 2022

    Passed: Building - Ext Strapping/Wall Sheathing

    Inspected by Anthony Aslan

  8. Nov 22, 2022

    Passed: Building - Roof Decking

    Inspected by Anthony Aslan

  9. Nov 30, 2022

    Passed: Building - Framing

    Inspected by Troy Crews

  10. Dec 22, 2022

    Passed: Mechanical - Rough In

    Adjust Chimney Pipe For Clearance To Osb

    Inspected by Troy Crews

  11. Dec 22, 2022

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Troy Crews

  12. Dec 22, 2022

    Passed: Electrical - 2nd Rough-In

    Inspected by Troy Crews

  13. Jan 10, 2023

    Passed: Building - Insulation

    Inspected by Troy Crews

  14. Mar 14, 2023

    Septic Release Inspection

    Inspected by Health Dept

  15. Mar 17, 2023

    Passed: Electrical - Permanent Power

    Inspected by Troy Crews

  16. Mar 17, 2023

    Release to power company

    Inspected by Troy Crews

  17. Apr 28, 2023

    Passed: Building - Final

    Gas Appliances Not On, Have Final Start Up Checked By Gas Supplier.

    Inspected by Troy Crews

Documents