| Septic Release Inspection |
|
Health Dept |
7/19/2022 |
| Passed: Building - Footer |
|
Matt Forsyth |
8/3/2022 |
| Passed: Engineering - Setbacks |
|
Matt Forsyth |
8/3/2022 |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Matt Forsyth |
9/15/2022 |
| Passed: Building - Slab |
Provide Letter To County Stating Using Bait System If Not Spraying Underslab |
Matt Forsyth |
9/19/2022 |
| Passed: Building - Roof Decking |
|
Matt Forsyth |
11/9/2022 |
| Passed: Building - Wall Sheathing |
|
Matt Forsyth |
11/9/2022 |
| Cancelled: Building - Ext Strapping/Wall Sheathing |
|
Matt Forsyth |
11/9/2022 |
| Passed: Building - Ext Strapping/Wall Sheathing |
|
Matt Forsyth |
11/14/2022 |
| Passed: Building - Framing |
Anchor Bolts Being Installed In One Corner That Was Missed |
Matt Forsyth |
11/14/2022 |
| Passed: Electrical - 2nd Rough-In |
|
Matt Forsyth |
12/30/2022 |
| Passed: Mechanical - Rough In |
This Inspection Was For Below Ceiling |
Matt Forsyth |
12/30/2022 |
| Passed: Plumbing/Gas - 2nd Rough-In |
|
Matt Forsyth |
12/30/2022 |
| Failed: Building - Insulation |
The Above Ceiling Mechanical Was Not Passed For Ductwork All Insulation Around Electrical Boots Must Be Removed For Above Ceiling Inspection |
Matt Forsyth |
1/11/2023 |
| Passed: Mechanical - Rough In |
Above Ceiling Ductwork |
Matt Forsyth |
1/13/2023 |
| Passed: Electrical - Permanent Power |
|
Matt Forsyth |
3/22/2023 |
| Release to power company |
|
Matt Forsyth |
3/22/2023 |
| Passed: Building - Final |
|
Matt Forsyth |
4/6/2023 |