Permit Details

Permit Search

Permit

New Residential Construction

267 SW TIMBERLAND CT
LAKE CITY, FL 32024

Permit #
000044868
Application #
54597
Status Completed
  1. Submitted May 20, 2022
  2. Issued Jul 5, 2022
  3. Expires Jul 26, 2023
  4. Completed Jan 27, 2023

Property

Parcel #
02438-176
Owner
Amaya Kellum
Acres
0.50
Subdivision
Emerald Cove Phase 2
Zoning
RSF-2
Flood zone
X
District
3

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Subdivision Plat
Finished floor requirement
112'
Requirement needed
By Nailing Inspection
Document needed is
a Surveyor letter giving the Finished Floor Elevation
Document receieved
Yes
Fema map number
12023C0290D
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
25'
Setback Side 1
10'
Setback Side 2
10'
Setbacks Rear
15'
Stories
1
Heated Area (Sqft)
1603
Total Area (Sqft)
2330
Building Height
18
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
22-0545
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Point Review - Processing
  3. Point Review - Printed-Online Application
  4. Point Review - Reviewed
  5. Plan Review - Building Approved
  6. Plan Review - Electrical Approved
  7. Plan Review - Mechanical Approved
  8. Plan Review - Plumbing Approved
  9. Plan Review - Reviewed
  10. Zoning Review - Reviewed
  11. Final Review - Reviewed
  12. Final Review - Documents Required
  13. Final Review - Reviewed
  14. Final Review - Payment Needed
  15. Permit Issued
  16. Final Review - Payment Needed

Contractors

  • Bryan Zecher

    Bryan Zecher Homes Inc

    License
    CBC1257343
    Title
    Building Contractor
    Role
    Contractor
  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Robert Ogles

    Ogles Roofing & Construction Llc

    License
    CCC1328699
    Title
    Cert Roofing
    Role
    Subcontractor

    County License & State License Expired.

  • Donald R Hollingsworth

    Holly Electric Inc

    License
    EC13005429
    Title
    Electrical
    Role
    Subcontractor
  • Anthony R Franks

    Lane Heating & Air Llc

    License
    CAC1818631
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

    County License & State License Expired.

Inspections

  1. Jul 12, 2022

    Passed: Building - Footer

    Inspected by Matt Forsyth

  2. Jul 12, 2022

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  3. Jul 25, 2022

    Passed: Electrical - Temporary Service

    Inspected by Matt Forsyth

  4. Jul 25, 2022

    Release to power company

    Inspected by Matt Forsyth

  5. Jul 27, 2022

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Matt Forsyth

  6. Aug 4, 2022

    Passed: Building - Slab

    Inspected by Troy Crews

  7. Sep 8, 2022

    Passed: Building - Ext Strapping/Wall Sheathing

    Inspected by Matt Forsyth

  8. Sep 13, 2022

    Passed: Building - Framing

    Clean Job Site And Nice Framing

    Inspected by Matt Forsyth

  9. Sep 15, 2022

    Cancelled: Electrical - Permanent Power

    Inspected by Matt Forsyth

  10. Sep 23, 2022

    Passed: Electrical - 2nd Rough-In

    Inspected by Matt Forsyth

  11. Sep 23, 2022

    Passed: Mechanical - Rough In

    Inspected by Matt Forsyth

  12. Sep 23, 2022

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Matt Forsyth

  13. Sep 23, 2022

    Passed: Plumbing/Gas - Tub Set/Shower Pan

    Tub Needs Water For Testing

    Inspected by Matt Forsyth

  14. Oct 4, 2022

    Passed: Building - Insulation

    Walls

    Inspected by Matt Forsyth

  15. Dec 2, 2022

    Passed: Electrical - Permanent Power

    Septic And Drive Releases Needed

    Inspected by Matt Forsyth

  16. Dec 2, 2022

    Release to power company

    Inspected by Matt Forsyth

  17. Jan 11, 2023

    Septic Release Inspection

    Inspected by Health Dept

  18. Jan 27, 2023

    Passed: Building - Final

    Inspected by Matt Forsyth

Documents