Permit Details

Permit Search

Permit

Roof Replacement or Repair

430 SW COLUMBIA AVE
LAKE CITY, FL 32025

Permit #
000044858
Application #
55250
Status Completed
  1. Submitted Jun 17, 2022
  2. Issued Jul 1, 2022
  3. Expires Jan 25, 2023
  4. Completed Jul 29, 2022

Property

Parcel #
13848-000
Owner
Baller James, Baller Deborah
Acres
0.12
Subdivision
Ashurst
Zoning
—
Flood zone
X
District
1

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0292D
Type Roofing Job
Replacement - Tear off Existing and Replace
Type of structure
House
Commercial or Residential
Residential
Roof Area (for this job) Sq Ft
1580
No. of Stories
1
Roof Pitch
4:12 or Greater
Is the existing roof being removed?
Yes
Type of New Roofing Product
Asphalt Shingles
Florida Product Approval Number
fl10124-r31
Product Manufacturer
gaf
Product Description
fiberglass reinforced asphalt
Building Code Edition
2020 Florida Building Code 7th Edition and Florida Statute 553.844
Sealed roof decking options: (Must select an option.)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Ventilation:
Off-ridge Vent
Flashing:
Repair Existing
Drip Edge:
Repair Existing
Valley Treatment:
Use Existing

Status & Review History

  1. City of Lake City Notified of Application within City of Lake City LC_GAS, LC_WATER, LC_SEWER.
  2. Final Review - Corrections Needed
  3. Final Review - Corrections Needed
  4. Final Review - Payment Needed
  5. Final Review - Payment Needed
  6. Permit Issued

Contractors

This is an owner-builder project.

Inspections

  1. Jul 7, 2022

    Passed: Re-Roof - In Progress

    Inspected by Troy Crews

  2. Jul 29, 2022

    Passed: Re-Roof - Final

    Inspected by Anthony Aslan