Status Completed
  1. Submitted May 17, 2022
  2. Issued Jun 22, 2022
  3. Expires Oct 2, 2023
  4. Completed Apr 6, 2023

Property

Parcel #
09860-002
Owner
Collar John & Sharon, Collar Sharon
Acres
2.02
Subdivision
Hawks Ridge Acres
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0512C
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
2700
Total Area (Sqft)
2700
Building Height
10
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
21-0733
If Other, explain the use of the structure.
build out of permit #42808
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
Other (explain)
Sealed roof decking explanation for other option.
closed cell spray foam

Status & Review History

  1. Point Review - Received-Hard Copy Application
  2. Point Review - Reviewed
  3. Zoning Review - Reviewed
  4. Plan Review - Documents Required
  5. Plan Review - Documents Required
  6. Plan Review - Building Approved
  7. Plan Review - Electrical Approved
  8. Plan Review - Mechanical Approved
  9. Plan Review - Plumbing Approved
  10. Plan Review - Reviewed
  11. Final Review - Documents Required
  12. Final Review - Documents Required
  13. Zoning Review - Reviewed
  14. Final Review - Reviewed
  15. Final Review - Payment Needed
  16. Permit Issued
  17. Final Review - Payment Needed

Contractors

This is an owner-builder project.

Inspections

  1. Sep 22, 2022

    Passed: Building - Framing

    Inspected by Anthony Aslan

  2. Sep 22, 2022

    Passed: Electrical - 2nd Rough-In

    Inspected by Anthony Aslan

  3. Oct 12, 2022

    Passed: Plumbing/Gas - 2nd Rough-In

    Need Pressure Gauge At Insulation Inspection checked Pressure

    Inspected by Anthony Aslan

  4. Nov 4, 2022

    Passed: Building - Insulation

    Inspected by Anthony Aslan

  5. Apr 4, 2023

    Passed: Engineering - Spot Check

    Need Blower Door, Disconnect For Water Heater

    Inspected by Anthony Aslan

  6. Apr 5, 2023

    Passed: Electrical - Permanent Power

    Need Septic Release

    Inspected by Anthony Aslan

  7. Apr 5, 2023

    Passed: Building - Final

    Need Septic Release resident Has Been Reminded That Trailer Has 45 Days From Co To Be Reomved Or Stup Applied For.

    Inspected by Anthony Aslan

  8. Apr 6, 2023

    Release to power company

    Septic Released

    Inspected by Anthony Aslan

  9. Apr 6, 2023

    Certificate-Release Certificate

    Septic Release & Received Picture

    Inspected by Anthony Aslan

  10. Apr 6, 2023

    Septic Release Inspection

    Inspected by Health Dept