Permit Details

Permit Search

Permit

Roof Replacement or Repair

717 SW EXPLORER GLN
FORT WHITE, FL 32038

Permit #
000044700
Application #
55236
Status Completed
  1. Submitted Jun 16, 2022
  2. Issued Jun 16, 2022
  3. Expires Dec 25, 2022
  4. Completed Jun 28, 2022

Property

Parcel #
03816-106
Owner
Wright Mary M
Acres
10.10
Subdivision
Crossroads Unr
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0485C
Type Roofing Job
Re-Cover - New Material over Existing
Type of structure
Mobile Home
Commercial or Residential
Residential
Roof Area (for this job) Sq Ft
1720
No. of Stories
1
Roof Pitch
4:12 or Greater
Is the existing roof being removed?
No
Explain if not removing the existing roofing material?
metal over existing shingle
Type of New Roofing Product
Metal
Florida Product Approval Number
FL17992_R2_II_29 GA
Product Manufacturer
Capital Metal
Product Description
29 gauge capital rib roof panel
Building Code Edition
2020 Florida Building Code 7th Edition and Florida Statute 553.844
Sealed roof decking options: (Must select an option.)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Ventilation:
Ridge Vent
Flashing:
Repair Existing
Drip Edge:
Replace All
Valley Treatment:
New Metal

Status & Review History

  1. Application pending.
  2. Point Review - Processing
  3. Final Review - Payment Needed
  4. Permit Issued

Contractors

  • Tyler M Turner

    Tmt Roofing Llc

    License
    CCC1330410
    Title
    Cert Roofing
    Role
    Contractor

Inspections

  1. Jun 21, 2022

    Passed: Re-Roof - In Progress

    Inspected by Anthony Aslan

  2. Jun 28, 2022

    Passed: Re-Roof - Final

    Inspected by Anthony Aslan