Permit Details

Permit Search

Permit

New Residential Construction

766 SW MANDIBA DR
LAKE CITY, FL 32024

Permit #
000044668
Application #
53149
Status Completed
  1. Submitted Mar 1, 2022
  2. Issued Jun 13, 2022
  3. Expires Sep 5, 2023
  4. Completed Mar 9, 2023

Property

Parcel #
09280-177
Owner
Ic Construction Llc,
Acres
1.02
Subdivision
Oaks Of Lake City Phase 2
Zoning
PRRD
Flood zone
X
District
5

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Subdivision Plat
Finished floor requirement
91'
Requirement needed
By Nailing Inspection
Document needed is
a Surveyor letter giving the Finished Floor Elevation
Document receieved
Yes
Fema map number
12023C0395C
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
2153
Total Area (Sqft)
3210
Building Height
20
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
22-0289
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Point Review - On Hold-Incomplete
  3. Point Review - On Hold-Incomplete
  4. Point Review - Printed-Online Application
  5. Point Review - Reviewed
  6. Plan Review - Documents Required
  7. Plan Review - Documents Required
  8. Plan Review - Documents Required
  9. Plan Review - Building Approved
  10. Plan Review - Electrical Approved
  11. Plan Review - Mechanical Approved
  12. Plan Review - Plumbing Approved
  13. Plan Review - Fuel/Gas Approved
  14. Plan Review - Reviewed
  15. Zoning Review - Reviewed
  16. Final Review - Documents Required
  17. Final Review - Documents Required
  18. Final Review - Payment Needed
  19. Permit Issued
  20. Final Review - Payment Needed

Contractors

  • Isaiah Cully

    Ic Construction Llc

    License
    CBC1259655
    Title
    Building Contractor
    Role
    Contractor
  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Tyler M Turner

    Tmt Roofing Llc

    License
    CCC1330410
    Title
    Cert Roofing
    Role
    Subcontractor
  • Everton D Ruddock

    D&s Lighting Inc

    License
    EC13003800
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Clinton G Wilson

    Wilson Heat & Air Inc

    License
    CAC057886
    Title
    Class B A/c
    Role
    Subcontractor

Inspections

  1. Jul 5, 2022

    Passed: Building - Footer

    Inspected by Troy Crews

  2. Jul 5, 2022

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  3. Jul 7, 2022

    Passed: Electrical - Temporary Service

    Inspected by Troy Crews

  4. Jul 7, 2022

    Release to power company

    Inspected by Troy Crews

  5. Jul 28, 2022

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Matt Forsyth

  6. Aug 3, 2022

    Passed: Building - Slab

    Inspected by Troy Crews

  7. Aug 3, 2022

    Passed: Building - Slab

    Inspected by Troy Crews

  8. Aug 31, 2022

    Passed: Building - Roof Decking

    Inspected by Troy Crews

  9. Aug 31, 2022

    Passed: Building - Wall Sheathing

    Inspected by Troy Crews

  10. Sep 16, 2022

    Failed: Mechanical - Rough In

    No Seals On Registers, Bath Fan Not Installed Or Connected.

    Inspected by Troy Crews

  11. Sep 16, 2022

    Passed: Building - Framing

    Inspected by Troy Crews

  12. Oct 28, 2022

    Passed: Electrical - 2nd Rough-In

    Inspected by Troy Crews

  13. Oct 28, 2022

    Passed: Mechanical - Rough In

    Inspected by Troy Crews

  14. Oct 28, 2022

    Passed: Plumbing/Gas - 2nd Rough-In

    Have Gas Provider Do Any Necessary Test And Final Connections.

    Inspected by Troy Crews

  15. Nov 9, 2022

    Passed: Building - Insulation

    Must Have Access To Air Handler In Attic Prior To Final

    Inspected by Troy Crews

  16. Dec 1, 2022

    Septic Release Inspection

    Inspected by Health Dept

  17. Feb 8, 2023

    Passed: Electrical - Permanent Power

    Need Driveway Final

    Inspected by Troy Crews

  18. Feb 10, 2023

    Release to power company

    Inspected by Melissa Garber

  19. Mar 7, 2023

    Failed: Building - Final

    Unable To Access Attic Due To Stairs Being To Tight To Operate, Also Attic Stair Door Needs Fire Rating Same As Garage Ceiling, Need Defused In Front Small Room

    Inspected by Gary Pitzer

  20. Mar 9, 2023

    Passed: Building - Final

    Inspected by Gary Pitzer

Documents