Permit Details

Permit Search

Permit

New Residential Construction

258 SW GUSTY GLN
LAKE CITY, FL 32025

Permit #
000044500
Application #
54157
Status Completed
  1. Submitted Mar 29, 2022
  2. Issued Jun 17, 2022
  3. Expires Aug 27, 2023
  4. Completed Mar 1, 2023

Property

Parcel #
08944-020
Owner
Sellers Michael I, Evans Christina L
Acres
10.45
Subdivision
Hillcrest Unr
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Engineers Elevation Letter
Finished floor requirement
12" ABOVE THE HIGEST ADJACENT GRADE
Requirement needed
By Nailing Inspection
Document needed is
a Surveyor letter giving the Finished Floor Elevation
Document receieved
Yes
Fema map number
12023C0403C
In floodway
N
This is the construction of a
Single Family Dwelling
Heated Area (Sqft)
2407
Total Area (Sqft)
3605
Stories
1
Building Height
23.6
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Septic# (00-0000) or (X00-000)
22-0432
Service Amps
399
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.

Status & Review History

  1. Application pending.
  2. Point Review - Processing
  3. Application Converted
  4. Point Review - Processing
  5. Point Review - Printed-Online Application
  6. Point Review - Reviewed
  7. Plan Review - Corrections Needed
  8. Plan Review - Building Approved
  9. Plan Review - Electrical Approved
  10. Plan Review - Mechanical Approved
  11. Plan Review - Plumbing Approved
  12. Plan Review - Fuel/Gas Approved
  13. Plan Review - Reviewed
  14. Zoning Review - Corrections Needed
  15. Zoning Review - Reviewed
  16. Zoning Review - Reviewed
  17. Final Review - Reviewed
  18. Final Review - Documents Required
  19. Final Review - Reviewed
  20. Final Review - Payment Needed
  21. Permit Issued
  22. Permit Reissued
  23. Final Review - Payment Needed

Contractors

  • Matthew Hentzelman

    Trademark Construction Group Inc.

    License
    CGC1514780
    Title
    General Contractor
    Role
    Contractor

    County License & State License Expired.

  • Roger Whiddon

    Lake City Plumbing Inc

    License
    CFC1428686
    Title
    Cert Plumbing
    Role
    Subcontractor
  • Matthew Hentzelman

    Trademark Construction Group, Inc.

    License
    CCC1329208
    Title
    Roofing Contractor
    Role
    Subcontractor

    County License & State License Expired.

  • David P Wood

    Wood's Electrical Services Inc

    License
    EC13002213
    Title
    Electrical Contractor
    Role
    Subcontractor
  • David E Hall

    David Hall's Air Cond & Heating Svc,inc.

    License
    CAC057424
    Title
    Class B A/c Contractor
    Role
    Subcontractor

    Workers Comp Expired.

Inspections

  1. Jun 15, 2022

    Passed: Building - Footer

    Inspected by Troy Crews

  2. Jun 15, 2022

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  3. Jul 12, 2022

    Septic Release Inspection

    Inspected by Health Dept

  4. Jul 18, 2022

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Troy Crews

  5. Jul 26, 2022

    Passed: Building - Slab

    Inspected by Anthony Aslan

  6. Aug 19, 2022

    Cancelled: Building - Roof Decking

    Rescheduled

    Inspected by Emaleigh Williams

  7. Aug 19, 2022

    Cancelled: Building - Wall Sheathing

    Rescheduled

    Inspected by Emaleigh Williams

  8. Aug 22, 2022

    Cancelled: Building - Roof Decking

    Rescheduled

    Inspected by Emaleigh Williams

  9. Aug 22, 2022

    Cancelled: Building - Wall Sheathing

    Rescheduled

    Inspected by Emaleigh Williams

  10. Aug 23, 2022

    Passed: Building - Roof Decking

    Inspected by Troy Crews

  11. Aug 23, 2022

    Passed: Building - Wall Sheathing

    Gable Flat Straps Are On Outside Of Gable Ends Done.

    Inspected by Troy Crews

  12. Oct 10, 2022

    Failed: Building - Framing

    A-07 Truss Broken At Heal Back Porch Repair Needed, Check And Tighten All Of The All Thread Rods As Needed.

    Inspected by Troy Crews

  13. Oct 10, 2022

    Passed: Electrical - 2nd Rough-In

    Inspected by Troy Crews

  14. Oct 10, 2022

    Failed: Mechanical - Rough In

    Dryer Vent Pipe Loose At Roof Connection.

    Inspected by Troy Crews

  15. Oct 10, 2022

    Passed: Plumbing/Gas - 2nd Rough-In

    Gas Line 18 Psi Test, Have Gas Company Do Test Also.

    Inspected by Troy Crews

  16. Oct 24, 2022

    Passed: Building - Insulation

    Inspected by Troy Crews

  17. Oct 24, 2022

    Passed: Building - Framing

    Repair Made

    Inspected by Troy Crews

  18. Oct 24, 2022

    Passed: Mechanical - Rough In

    Repair Made

    Inspected by Troy Crews

  19. Jan 18, 2023

    Passed: Electrical - Permanent Power

    Inspected by Troy Crews

  20. Feb 28, 2023

    Passed: Building - Final

    Ac Unit To Be Repaired Under Warranty Per Contractor.

    Inspected by Troy Crews

Documents