Permit Details

Permit Search

Permit

New Residential Construction

2910 SE COUNTY ROAD 252
LAKE CITY, FL 32025

Permit #
000044469
Application #
53917
Status Permit Renewed
  1. Submitted Mar 11, 2022
  2. Issued Apr 9, 2026
  3. Expires Dec 19, 2026
  4. Completed —

Property

Parcel #
08665-005
Owner
Windham Walker,
Acres
1.64
Subdivision
—
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Permit Renewed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0313D
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
1500
Total Area (Sqft)
2300
Building Height
17
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
25-0456
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Point Review - Printed-Online Application
  3. Point Review - Reviewed
  4. Plan Review - Documents Required
  5. Plan Review - Building Approved
  6. Plan Review - Electrical Approved
  7. Plan Review - Mechanical Approved
  8. Plan Review - Plumbing Approved
  9. Plan Review - Reviewed
  10. Zoning Review - Reviewed
  11. Zoning Review - Reviewed
  12. Final Review - Documents Required
  13. Final Review - Documents Required
  14. Final Review - Documents Required
  15. Final Review - Reviewed
  16. Final Review - Payment Needed
  17. Permit Issued
  18. Permit Renewed
  19. Permit Renewed
  20. Permit Reissued
  21. Permit Status Update Notification
  22. Permit Status Update Notification
  23. Permit Renewed

Contractors

  • Clinton G Wilson

    Wilson Heat & Air Inc

    License
    CAC057886
    Title
    Class B A/c
    Role
    Subcontractor
  1. May 20, 2022

    Passed: Engineering - Setbacks

    Inspected by Anthony Aslan

  2. May 20, 2022

    Passed: Building - Footer

    Inspected by Anthony Aslan

  3. Jul 12, 2022

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Anthony Aslan

  4. Jul 14, 2022

    Passed: Electrical - Temporary Service

    Ground Rod Needs To Be Drove In The Ground

    Inspected by Anthony Aslan

  5. Jul 14, 2022

    Release to power company

    Inspected by Anthony Aslan

  6. Jul 14, 2022

    Rescheduled 7/15/2022:Building - Slab

    Inspected by Anthony Aslan

  7. Jul 15, 2022

    Passed: Building - Slab

    Inspected by Anthony Aslan

  8. Oct 3, 2022

    Passed: Building - Roof Decking

    Inspected by Anthony Aslan

  9. Oct 3, 2022

    Passed: Building - Wall Sheathing

    Inspected by Anthony Aslan

  10. Oct 4, 2022

    Failed: Building - Framing

    Plans On Site Are Not Plans Summitted To Bldg. Dept., Different Spacing For Rafters And Ceiling Joist. Windows Not Installed. Need Letter From Engineer For Rafters And Ceiling Joist. Plan Need To Be Summitted

    Inspected by Anthony Aslan

  11. Nov 1, 2022

    Cancelled: Building - Roof Decking

    Inspected by Anthony Aslan

  12. Nov 1, 2022

    Passed: Building - Framing

    Inspected by Anthony Aslan

  13. Aug 23, 2023

    Passed: Electrical - 2nd Rough-In

    Inspected by Anthony Aslan

  14. Aug 23, 2023

    Passed: Mechanical - Rough In

    Return Flex Loose At Plenum

    Inspected by Anthony Aslan

  15. Jun 13, 2024

    Passed: Plumbing/Gas - 2nd Rough-In

    Need To Relocate Tub Valve

    Inspected by Anthony Aslan

  16. Jun 20, 2024

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Anthony Aslan

  17. Jun 20, 2024

    Passed: Plumbing/Gas - Tub Set/Shower Pan

    Inspected by Anthony Aslan

  18. Jul 1, 2024

    Passed: Building - Insulation

    Walls And Ceiling Spray Foam

    Inspected by Anthony Aslan

  19. Jul 24, 2025

    Passed: Electrical - Permanent Power

    Need Septic Release

    Inspected by Anthony Aslan

  20. Aug 12, 2025

    Release to power company

    Rec'd Septic

    Inspected by Ewilliams

  21. Aug 12, 2025

    Septic Release Inspection

    Inspected by Health Dept

  22. Jun 22, 2026

    Passed: Building - Final

    *final Termite Required Prior To Release Of Co-- 9.14.26 Mg

    Inspected by Christian Allen