Permit Details

Permit Search

Permit

Roof Replacement or Repair

157 SW GARDEN CT
LAKE CITY, FL 32024

Permit #
000044335
Application #
54615
Status Completed
  1. Submitted May 3, 2022
  2. Issued May 3, 2022
  3. Expires Nov 20, 2022
  4. Completed May 24, 2022

Property

Parcel #
03023-112
Owner
Skeen Iris J
Acres
0.50
Subdivision
Callaway Phase 1
Zoning
RSF-2
Flood zone
X
District
3

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0289D
Type Roofing Job
Replacement - Tear off Existing and Replace
Type of structure
House
Commercial or Residential
Residential
Roof Area (for this job) Sq Ft
2306
No. of Stories
1
Roof Pitch
2:12 to 4:12
Is the existing roof being removed?
Yes
Type of New Roofing Product
Asphalt Shingles
Florida Product Approval Number
FL10674-R14
Product Manufacturer
TamKo
Product Description
30 yr limited lifetime shingles
Building Code Edition
2020 Florida Building Code 7th Edition and Florida Statute 553.844
Sealed roof decking options: (Must select an option.)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Ventilation:
Ridge Vent
Flashing:
Repair Existing
Drip Edge:
Replace All
Valley Treatment:
New Metal

Status & Review History

  1. Application pending.
  2. City of Lake City Utilities Notified
  3. Point Review - Processing
  4. Final Review - Payment Needed
  5. City of Lake City
  6. Permit Issued

Contractors

  • Tyler M Turner

    Tmt Roofing Llc

    License
    CCC1330410
    Title
    Cert Roofing
    Role
    Contractor

Inspections

  1. May 19, 2022

    Passed: Re-Roof - In Progress

    Inspected by Matt Forsyth

  2. May 24, 2022

    Passed: Re-Roof - Final

    Inspected by Troy Crews