Permit Details

Permit Search

Permit

New Residential Construction

712 SW NEWARK DR
FORT WHITE, FL 32038

Permit #
000044286
Application #
54097
Status Completed
  1. Submitted Mar 25, 2022
  2. Issued Apr 27, 2022
  3. Expires Feb 19, 2025
  4. Completed Aug 28, 2024

Property

Parcel #
01177-001
Owner
Swink Christopher, Swink Ramsie
Acres
0.91
Subdivision
Three Rivers Estates Unit 19
Zoning
A-3
Flood zone
X
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0459C
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
10'
Setback Side 2
10'
Setbacks Rear
25'
Stories
2
Heated Area (Sqft)
3000
Total Area (Sqft)
7017
Building Height
16
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
24-0580
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Service Amps
400

Status & Review History

  1. Application pending.
  2. Final Review - Corrections Needed
  3. Point Review - On Hold-Incomplete
  4. Point Review - Printed-Online Application
  5. Point Review - Reviewed
  6. Plan Review - Building Approved
  7. Plan Review - Electrical Approved
  8. Plan Review - Mechanical Approved
  9. Plan Review - Plumbing Approved
  10. Plan Review - Fuel/Gas Approved
  11. Plan Review - Reviewed
  12. Zoning Review - Reviewed
  13. Zoning Review - Reviewed
  14. Final Review - Documents Required
  15. Final Review - Documents Required
  16. Final Review - Documents Required
  17. Final Review - Documents Required
  18. Final Review - Reviewed
  19. Final Review - Payment Needed
  20. Permit Issued
  21. Final Review - Payment Needed

Contractors

This is an owner-builder project.

Inspections

  1. Jun 9, 2022

    Failed: Electrical - Temporary Service

    Breaker Panel Missing Front Door

    Inspected by Matt Forsyth

  2. Jun 15, 2022

    Passed: Electrical - Temporary Service

    Inspected by Matt Forsyth

  3. Jun 15, 2022

    Release to power company

    Inspected by Matt Forsyth

  4. Jun 15, 2022

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Need Porto Potty On Site Also Permit . Will Need Compaction Test

    Inspected by Matt Forsyth

  5. Jun 16, 2022

    Cancelled: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Matt Forsyth

  6. Jun 21, 2022

    Cancelled: Engineering - Setbacks

    Inspected by Melissa Garber

  7. Jun 21, 2022

    Cancelled: Building - Monolithic Slab

    Inspected by Melissa Garber

  8. Jun 21, 2022

    Passed: Building - Footer

    Inspected by Matt Forsyth

  9. Jun 21, 2022

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  10. Jun 21, 2022

    Passed: Building - Monolithic Slab

    Inspected by Matt Forsyth

  11. Jun 21, 2022

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  12. Oct 19, 2022

    Passed: Building - Footer

    Finishes Post Footers

    Inspected by Matt Forsyth

  13. Oct 19, 2022

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  14. Nov 29, 2022

    Passed: Building - Footer

    Inspected by Matt Forsyth

  15. Nov 29, 2022

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  16. Jul 13, 2023

    Cancelled: Plumbing/Gas - 2nd Rough-In

    Inspected by Bnztemp

  17. Jul 14, 2023

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Matt Forsyth

  18. Jul 14, 2023

    Passed: Building - Framing

    Need To Improve Nailing On Headers Will Inspect At Insulation

    Inspected by Matt Forsyth

  19. Jan 30, 2024

    Passed: Electrical - 2nd Rough-In

    Headers Were Inspected For Nailing

    Inspected by Matt Forsyth

  20. Feb 21, 2024

    Passed: Building - Insulation

    Inspected by Matt Forsyth

  21. Jul 15, 2024

    Passed: Electrical - Permanent Power

    Waiting On Driveway And Septic Documents

    Inspected by Matt Forsyth

  22. Aug 2, 2024

    Release to power company

    Rec'd Septic

    Inspected by Emaleigh Williams

  23. Aug 2, 2024

    Septic Release Inspection

    Inspected by Health Dept

  24. Aug 19, 2024

    Failed: Building - Final

    Need Blower Door Test Submitted And Reviewed Electrical Panel Box Labeled And Hand Rail Installed

    Inspected by Matt Forsyth

  25. Aug 23, 2024

    Certificate-Release Certificate

    Inspected by Matt Forsyth

  26. Aug 23, 2024

    Passed: Building - Final

    All Final Items Have Been Addressed And Reviewed

    Inspected by Matt Forsyth

Documents