Permit Details

Permit Search

Permit

New Residential Construction

480 SW GRAPEVINE CT
FORT WHITE, FL 32038

Permit #
000044260
Application #
50276
Status Completed
  1. Submitted Aug 17, 2021
  2. Issued Apr 25, 2022
  3. Expires Nov 4, 2025
  4. Completed May 19, 2025

Property

Parcel #
03817-211
Owner
Laird Larry D & Linda
Acres
10.03
Subdivision
Old Wire Forest Unr
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0485C
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
1800
Total Area (Sqft)
1800
Building Height
12
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
21-0707
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
Other (explain)
Sealed roof decking explanation for other option.
part of building metal
Service Amps
200

Status & Review History

  1. Application pending.
  2. Point Review - Email Sent
  3. Point Review - On Hold-Incomplete
  4. Point Review - Printed-Online Application
  5. Point Review - Reviewed
  6. Plan Review - Documents Required
  7. Plan Review - Documents Required
  8. Plan Review - Plumbing Approved
  9. Plan Review - Electrical Approved
  10. Plan Review - Building Approved
  11. Plan Review - Reviewed
  12. Plan Review - Reviewed
  13. Zoning Review - Reviewed
  14. Zoning Review - Reviewed
  15. Final Review - Reviewed
  16. Final Review - Payment Needed
  17. Final Review - Payment Needed
  18. Final Review - Payment Needed
  19. Permit Issued
  20. Point Review - Reviewed
  21. Final Review - Complete

Contractors

No contractors are listed on this permit.

Inspections

  1. Aug 26, 2021

    Septic Release Inspection

    Inspected by Health Dept

  2. Jul 11, 2022

    Rescheduled 7/12/2022:Plumbing/Gas - 1st Underground Rough–In

    Inspected by Troy Crews

  3. Jul 12, 2022

    Cancelled: Building - Slab

    Inspected by Anthony Aslan

  4. Jul 12, 2022

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Anthony Aslan

  5. Jul 20, 2022

    Passed: Building - Slab

    Inspected by Anthony Aslan

  6. Jan 5, 2023

    Passed: Engineering - Spot Check

    Checked Setbacks

    Inspected by Anthony Aslan

  7. Jun 23, 2023

    Passed: Engineering - Spot Check

    Checked Slab

    Inspected by Anthony Aslan

  8. Aug 28, 2023

    Cancelled: Building - Roof Decking

    Inspected by Gary Pitzer

  9. Aug 28, 2023

    Cancelled: Building - Wall Sheathing

    Inspected by Gary Pitzer

  10. Aug 28, 2023

    Failed: Building - Framing

    Need Engineers Leter For Wind Post Anchors

    Inspected by Gary Pitzer

  11. Aug 28, 2023

    Failed: Building - Strapping

    Need Engineers Lettler For Wind Post

    Inspected by Gary Pitzer

  12. Dec 12, 2023

    Passed: Building - Footer

    Inspected by Gary Pitzer

  13. Dec 12, 2023

    Passed: Engineering - Setbacks

    Inspected by Gary Pitzer

  14. Jan 31, 2024

    Building-Framing

    Passed Per Eng Letter

    Inspected by Gary Pitzer

  15. Jan 31, 2024

    Building-Strapping

    Passed Per Eng Letter

    Inspected by Gary Pitzer

  16. Jan 31, 2024

    Passed: Electrical - Temporary Service

    Inspected by Gary Pitzer

  17. Jan 31, 2024

    Release to power company

    Inspected by Gary Pitzer

  18. Jul 26, 2024

    Passed: Building - Insulation

    Foam Walls And Roof Letter On File

    Inspected by Gary Pitzer

  19. Feb 4, 2025

    Failed: Building - Framing

    1. Need Engineering For Cantilever Over 2 Ft, At Balcony 2. If The Interior Walls Are Not Tight To The Exterior At The Top Draft Stopping Shall Be Installed, 3.need Stairs Installed To Loft Area

    Inspected by Gary Pitzer

  20. Feb 5, 2025

    Cancelled: Electrical - 2nd Rough-In

    Inspected by Gary Pitzer

  21. Feb 10, 2025

    Rescheduled 2/14/2025:Electrical - 2nd Rough-In

    Inspected by Neonta Anderson

  22. Feb 10, 2025

    Rescheduled 2/14/2025:Electrical - Above Ceiling

    Inspected by Neonta Anderson

  23. Feb 14, 2025

    Passed: Building - Framing

    Letter Received, Corrections Made

    Inspected by Anthony Aslan

  24. Feb 14, 2025

    Cancelled: Electrical - 2nd Rough-In

    Inspected by Anthony Aslan

  25. Mar 3, 2025

    Passed: Electrical - 2nd Rough-In

    Inspected by Anthony Aslan

  26. Mar 3, 2025

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Anthony Aslan

  27. Apr 22, 2025

    Passed: Plumbing/Gas - Tub Set/Shower Pan

    Inspected by Gary Pitzer

  28. Apr 22, 2025

    Passed: Electrical - Permanent Power

    Inspected by Gary Pitzer

  29. Apr 22, 2025

    Release to power company

    Inspected by Gary Pitzer

  30. May 8, 2025

    Passed: Building - Final

    Cannot Closed Permit Or Release Certificate Of Occupancy Due To Missing Required Documents.

    Inspected by Gary Pitzer

  31. May 19, 2025

    Certificate-Release Certificate

    Inspected by Gary Pitzer

Documents